Assessment Year | 1986 |
---|---|
Principal Product | ENVELOPES |
NAICS |
n/a
|
SIC | 2677: Envelopes |
Sales Range | $10 M to 50M |
# of Employees | 185 |
Plant Area |
n/a
|
Annual Production | 1,500,000
pieces
|
Production Hrs. Annual | 5,760
hrs
|
Location (State) | Kansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $215,487 | 3,461,899 |
kWh
|
$0.062 |
Natural Gas | $10,818 | 2,805 |
MMBtu
|
$3.86 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $19,470 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $17,899 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.4312: Improve lubrication practices | $7,588 | $3,325 |
$7,588
121,923
kWh
|
- | - | |
02 | 2.6232: Install set-back timers | $5,599 | $2,100 |
$5,599
89,977
kWh
|
- | - | |
03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $2,772 | - |
$2,772
44,549
kWh
|
- | - | |
04 | 2.6121: Reduce hot water temperature to the minimum required | $876 | - |
$876
14,068
kWh
|
- | - | |
05 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $726 | $1,200 |
$985
15,826
kWh
|
$(-259.0)
-
MMBtu
|
- | |
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $711 | $40 |
$711
11,430
kWh
|
- | - | |
07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $693 | $50 |
$693
11,137
kWh
|
- | - | |
08 | 2.2437: Recover waste heat from equipment | $371 | $200 | - |
$371
-
MMBtu
|
- | |
09 | 2.6214: Shut off pilots in standby equipment | $134 | - | - |
$154
-
MMBtu
|
$(-20.0) | |
TOTAL RECOMMENDED | $19,470 | $6,915 |
$19,224
308,910
kWh
|
$266
-
MMBtu
|
$(-20.0) | ||
TOTAL IMPLEMENTED | $17,899 | $5,675 |
$17,528
281,654
kWh
|
$371
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs