ITAC Assessment: SU0104
ITAC logo
ITAC Assessment: SU0104
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Industrial Filters
NAICS
n/a
SIC 3569: General Industrial Machinery and Equipment, Not Elsewhere
Sales Range $5
M
to 10
M
# of Employees 47
Plant Area 37,029
ft2
Annual Production 60
units
Production Hrs. Annual 2,080
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $26,900 389,280
kWh
Electricity Demand $24,808 1,657
kW-mo/yr
Electricity Fees $3,122 -
Natural Gas $16,109 2,437
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,913 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,269

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $92 - $92
1,455
kWh
- -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $147 - $62
986
kWh
$85
-
kW-mo/yr
-
03 2.7111: Reduce illumination to minimum necessary levels $3,030 $4,460 $2,018
32,024
kWh
$1,012
-
kW-mo/yr
-
04 2.7442: Keep doors and windows shut when not on use $8,614 $20,500 - - $8,614
-
MMBtu
05 2.4221: Install compressor air intakes in coolest locations $30 $79 $30
480
kWh
- -
TOTAL RECOMMENDED $11,913 $25,039 $2,202
34,945
kWh
$1,097
-
kW-mo/yr
$8,614
-
MMBtu
TOTAL IMPLEMENTED $3,269 $4,460 $2,172
34,465
kWh
$1,097
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs