| Assessment Year | 2001 |
|---|---|
| Principal Product | Fuel, Cooling, and Lubricating Modules |
| NAICS |
n/a
|
| SIC | 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified |
| Sales Range | n/a |
| # of Employees | 250 |
| Plant Area |
180,000
ft2
|
| Annual Production | 0
pieces
|
| Production Hrs. Annual | 4,680
hrs
|
| Location (State) | New York |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $160,089 | 2,947,500 |
kWh
|
$0.054 |
| Electricity Demand | $71,538 | 8,090 |
kW-mo/yr
|
$8.84 |
| Natural Gas | $166,600 | 225,300 |
MMBtu
|
$0.74 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $102,861 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $11,449 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7261: Install timers and/or thermostats | $38,346 | $1,632 | - | - |
$38,346
-
MMBtu
|
|
| 02 | 2.7447: Install vinyl strip / high speed / air curtain doors | $25,154 | $7,162 | - | - |
$25,154
-
MMBtu
|
|
| 03 | 2.2136: Install / repair insulation on steam lines | $8,880 | $1,125 | - | - |
$8,880
-
MMBtu
|
|
| 04 | 2.6218: Turn off equipment when not in use | $1,743 | - |
$1,619
32,380
kWh
|
$124
-
kW-mo/yr
|
- | |
| 05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $444 | - |
$444
8,880
kWh
|
- | - | |
| 06 | 2.4221: Install compressor air intakes in coolest locations | $826 | $543 |
$826
15,300
kWh
|
- | - | |
| 07 | 2.2515: Use optimum thickness insulation | $27,468 | $36,700 | - | - |
$27,468
-
MMBtu
|
|
| TOTAL RECOMMENDED | $102,861 | $47,162 |
$2,889
56,560
kWh
|
$124
-
kW-mo/yr
|
$99,848
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $11,449 | $1,668 |
$2,445
47,680
kWh
|
$124
-
kW-mo/yr
|
$8,880
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs