ITAC Assessment: SU0103
ITAC logo
ITAC Assessment: SU0103
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Fuel, Cooling, and Lubricating Modules
NAICS
n/a
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range n/a
# of Employees 250
Plant Area 180,000
ft2
Annual Production 0
pieces
Production Hrs. Annual 4,680
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $160,089 2,947,500
kWh
Electricity Demand $71,538 8,090
kW-mo/yr
Natural Gas $166,600 225,300
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $102,861 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,449

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7261: Install timers and/or thermostats $38,346 $1,632 - - $38,346
-
MMBtu
02 2.7447: Install vinyl strip / high speed / air curtain doors $25,154 $7,162 - - $25,154
-
MMBtu
03 2.2136: Install / repair insulation on steam lines $8,880 $1,125 - - $8,880
-
MMBtu
04 2.6218: Turn off equipment when not in use $1,743 - $1,619
32,380
kWh
$124
-
kW-mo/yr
-
05 2.4231: Reduce the pressure of compressed air to the minimum required $444 - $444
8,880
kWh
- -
06 2.4221: Install compressor air intakes in coolest locations $826 $543 $826
15,300
kWh
- -
07 2.2515: Use optimum thickness insulation $27,468 $36,700 - - $27,468
-
MMBtu
TOTAL RECOMMENDED $102,861 $47,162 $2,889
56,560
kWh
$124
-
kW-mo/yr
$99,848
-
MMBtu
TOTAL IMPLEMENTED $11,449 $1,668 $2,445
47,680
kWh
$124
-
kW-mo/yr
$8,880
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs