| Assessment Year | 1986 |
|---|---|
| Principal Product | COMPONENTS FOR ELEC EQUIPMENT |
| NAICS |
n/a
|
| SIC | 3621: Motors and Generators |
| Sales Range | $10 M to 50M |
| # of Employees | 199 |
| Plant Area |
n/a
|
| Annual Production | 60,000
pieces
|
| Production Hrs. Annual | 2,000
hrs
|
| Location (State) | Pennsylvania |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $238,379 | 3,165,885 |
kWh
|
$0.075 |
| Natural Gas | $26,264 | 3,208 |
MMBtu
|
$8.19 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $103,605 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $27,563 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.2437: Recover waste heat from equipment | $2,389 | $1,400 |
$2,389
31,653
kWh
|
- | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,035 | - |
$1,035
13,775
kWh
|
- | |
| 03 | 2.4221: Install compressor air intakes in coolest locations | $148 | $100 |
$148
2,052
kWh
|
- | |
| 04 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $63,655 | $200,000 |
$111,337
1,479,191
kWh
|
$(-47,682.0)
-
MMBtu
|
|
| 05 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $12,141 | $40,000 |
$21,425
284,584
kWh
|
$(-9,284.0)
-
MMBtu
|
|
| 06 | 2.7224: Reduce space conditioning during non-working hours | $18,041 | - |
$18,041
239,742
kWh
|
- | |
| 07 | 2.7261: Install timers and/or thermostats | $5,537 | $1,000 |
$5,537
73,564
kWh
|
- | |
| 08 | 2.4133: Use most efficient type of electric motors | $65 | $200 |
$65
879
kWh
|
- | |
| 09 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $181 | $160 |
$181
2,345
kWh
|
- | |
| 10 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $413 | - |
$413
5,569
kWh
|
- | |
| TOTAL RECOMMENDED | $103,605 | $242,860 |
$160,571
2,133,354
kWh
|
$(-56,966.0)
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $27,563 | $2,500 |
$27,563
366,355
kWh
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs