ITAC Assessment: ST0062
ITAC logo
ITAC Assessment: ST0062
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product PROCESS EQUIPMENT
NAICS
n/a
SIC 3433: Heating Equipment, Except Electric and Warm Air Furnaces
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area
n/a
Annual Production 1,500
pieces
Production Hrs. Annual 4,375
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $183,037 2,172,919
kWh
Natural Gas $114,306 20,060
MMBtu
Fuel Oil #6 $12,098 2,858
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $17,185 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,355

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $4,343 $537 - $4,343
-
MMBtu
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,642 - $4,642
55,100
kWh
-
03 2.4231: Reduce the pressure of compressed air to the minimum required $1,555 - $1,555
18,464
kWh
-
04 2.6121: Reduce hot water temperature to the minimum required $716 - $716
8,499
kWh
-
05 2.7447: Install vinyl strip / high speed / air curtain doors $559 $50 - $559
-
MMBtu
06 2.7261: Install timers and/or thermostats $2,605 $1,500 - $2,605
-
MMBtu
07 2.4133: Use most efficient type of electric motors $2,765 $651 $2,765
32,825
kWh
-
TOTAL RECOMMENDED $17,185 $2,738 $9,678
114,888
kWh
$7,507
-
MMBtu
TOTAL IMPLEMENTED $14,355 $2,688 $7,407
87,925
kWh
$6,948
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs