ITAC logo
ITAC Assessment: ST0056
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product MACHINERY TO MAKE BOXES
NAICS
n/a
SIC 3399: Primary Metal Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 347
Plant Area
n/a
Annual Production 36
pieces
Production Hrs. Annual 4,250
hrs
Location (State) Maryland

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $257,267 4,633,646
kWh
Natural Gas $68,538 10,804
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $33,988 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $27,577

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,320 $300 $5,320
95,838
kWh
- -
02 2.4231: Reduce the pressure of compressed air to the minimum required $1,188 - $1,188
21,395
kWh
- -
03 2.7447: Install vinyl strip / high speed / air curtain doors $3,113 $4,000 - $3,090
-
MMBtu
$23
04 2.7261: Install timers and/or thermostats $14,588 $4,000 - $14,588
-
MMBtu
-
05 2.1123: Install automatic stack damper $2,110 $6,020 - $2,110
-
MMBtu
-
06 2.7226: Use computer programs to optimize hvac performance $4,464 $6,000 $4,464
80,305
kWh
- -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $2,785 $1,776 $2,785
50,117
kWh
- -
08 2.6121: Reduce hot water temperature to the minimum required $420 - - $420
-
MMBtu
-
TOTAL RECOMMENDED $33,988 $22,096 $13,757
247,655
kWh
$20,208
-
MMBtu
$23
TOTAL IMPLEMENTED $27,577 $12,076 $12,569
226,260
kWh
$15,008
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs