Assessment Year | 1985 |
---|---|
Principal Product | CUSTOM-MADE MACHINES |
NAICS |
n/a
|
SIC | 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified |
Sales Range | $1 M to 5M |
# of Employees | 47 |
Plant Area |
n/a
|
Annual Production | 220,000
pieces
|
Production Hrs. Annual | 2,875
hrs
|
Location (State) | New Jersey |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $48,754 | 398,886 |
kWh
|
$0.12 |
Natural Gas | $7,058 | 1,058 |
MMBtu
|
$6.67 |
Fuel Oil #2 | $21,636 | 3,080 |
MMBtu
|
$7.02 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $10,384 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $6,117 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #2 Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,436 | $567 |
$3,436
28,136
kWh
|
- | - | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $415 | $100 |
$415
3,517
kWh
|
- | - | - | |
03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $179 | $122 |
$179
1,465
kWh
|
- | - | - | |
04 | 2.7228: Avoid introducing hot, humid, or dirty air into hvac system | $279 | $500 |
$279
2,345
kWh
|
- | - | - | |
05 | 2.4227: Use compressor air filters | $49 | - |
$79
586
kWh
|
- | - | $(-30.0) | |
06 | 2.4133: Use most efficient type of electric motors | $473 | $917 |
$473
3,810
kWh
|
- | - | - | |
07 | 2.7224: Reduce space conditioning during non-working hours | $5,195 | - | - |
$673
-
MMBtu
|
$4,522
-
MMBtu
|
- | |
08 | 2.7447: Install vinyl strip / high speed / air curtain doors | $358 | $63 | - | - |
$358
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $10,384 | $2,269 |
$4,861
39,859
kWh
|
$673
-
MMBtu
|
$4,880
-
MMBtu
|
$(-30.0) | ||
TOTAL IMPLEMENTED | $6,117 | $722 |
$952
7,913
kWh
|
$673
-
MMBtu
|
$4,522
-
MMBtu
|
$(-30.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #2 Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs