ITAC Assessment: ST0044
ITAC logo
ITAC Assessment: ST0044
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product CUSTOM METAL STRUCTURES
NAICS
n/a
SIC 3444: Sheet Metal Work
Sales Range $1
M
to 5
M
# of Employees 55
Plant Area
n/a
Annual Production 300
ton
Production Hrs. Annual 2,375
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $40,507 325,029
kWh
Natural Gas $11,778 1,810
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $12,448 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,198

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $3,000 $774 $3,000
24,033
kWh
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,595 $100 $5,595
44,842
kWh
-
03 2.4221: Install compressor air intakes in coolest locations $453 $30 $453
3,517
kWh
-
04 2.4231: Reduce the pressure of compressed air to the minimum required $967 - $967
7,620
kWh
-
05 2.6121: Reduce hot water temperature to the minimum required $231 - $175
1,465
kWh
$56
-
MMBtu
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $110 $90 $110
879
kWh
-
07 2.1311: Replace electrically-operated equipment with fossil fuel equipment $496 $1,100 $649
5,275
kWh
$(-153.0)
-
MMBtu
08 2.1311: Replace electrically-operated equipment with fossil fuel equipment $221 $390 $282
2,345
kWh
$(-61.0)
-
MMBtu
09 2.7447: Install vinyl strip / high speed / air curtain doors $247 $110 - $247
-
MMBtu
10 2.7494: Install storm windows and doors $225 $400 - $225
-
MMBtu
11 2.4133: Use most efficient type of electric motors $294 $182 $294
2,345
kWh
-
12 2.1233: Analyze flue gas for proper air/fuel ratio $609 $200 - $609
-
MMBtu
TOTAL RECOMMENDED $12,448 $3,376 $11,525
92,321
kWh
$923
-
MMBtu
TOTAL IMPLEMENTED $1,198 - $1,142
9,085
kWh
$56
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs