| Assessment Year | 1985 |
|---|---|
| Principal Product | CUSTOM METAL STRUCTURES |
| NAICS |
n/a
|
| SIC | 3444: Sheet Metal Work |
| Sales Range | $1 M to 5M |
| # of Employees | 55 |
| Plant Area |
n/a
|
| Annual Production | 300
ton
|
| Production Hrs. Annual | 2,375
hrs
|
| Location (State) | New Jersey |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $40,507 | 325,029 |
kWh
|
$0.12 |
| Natural Gas | $11,778 | 1,810 |
MMBtu
|
$6.51 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $12,448 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $1,198 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,000 | $774 |
$3,000
24,033
kWh
|
- | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,595 | $100 |
$5,595
44,842
kWh
|
- | |
| 03 | 2.4221: Install compressor air intakes in coolest locations | $453 | $30 |
$453
3,517
kWh
|
- | |
| 04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $967 | - |
$967
7,620
kWh
|
- | |
| 05 | 2.6121: Reduce hot water temperature to the minimum required | $231 | - |
$175
1,465
kWh
|
$56
-
MMBtu
|
|
| 06 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $110 | $90 |
$110
879
kWh
|
- | |
| 07 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $496 | $1,100 |
$649
5,275
kWh
|
$(-153.0)
-
MMBtu
|
|
| 08 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $221 | $390 |
$282
2,345
kWh
|
$(-61.0)
-
MMBtu
|
|
| 09 | 2.7447: Install vinyl strip / high speed / air curtain doors | $247 | $110 | - |
$247
-
MMBtu
|
|
| 10 | 2.7494: Install storm windows and doors | $225 | $400 | - |
$225
-
MMBtu
|
|
| 11 | 2.4133: Use most efficient type of electric motors | $294 | $182 |
$294
2,345
kWh
|
- | |
| 12 | 2.1233: Analyze flue gas for proper air/fuel ratio | $609 | $200 | - |
$609
-
MMBtu
|
|
| TOTAL RECOMMENDED | $12,448 | $3,376 |
$11,525
92,321
kWh
|
$923
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $1,198 | - |
$1,142
9,085
kWh
|
$56
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs