ITAC Assessment: LS0011
ITAC logo
ITAC Assessment: LS0011
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Portable Drinking Water
NAICS 221310: Water Supply and Irrigation Systems
SIC 4941: Water Supply
Sales Range $10
M
to 50
M
# of Employees 265
Plant Area 36,020
ft2
Annual Production 2,424,366
units
Production Hrs. Annual 8,760
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $290,800 4,409,600
kWh
Electricity Demand $39,815 9,664
kW-mo/yr
Natural Gas $1,085 130
MMBtu
TOTAL YEARLY COSTS $331,700
RECOMMENDED SAVINGS* $35,627 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $291

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4131: Size electric motors for peak operating efficiency $30,575 $67,000 $14,912
226,115
kWh
$15,663
-
kW-mo/yr
02 2.7261: Install timers and/or thermostats $1,608 $600 $1,608
24,399
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $2,983 $9,913 $2,259
34,528
kWh
$724
-
kW-mo/yr
04 2.7135: Install occupancy sensors $170 $210 $170
2,582
kWh
-
05 2.7442: Keep doors and windows shut when not on use $291 - $291
4,416
kWh
-
TOTAL RECOMMENDED $35,627 $77,723 $19,240
292,040
kWh
$16,387
-
kW-mo/yr
TOTAL IMPLEMENTED $291 - $291
4,416
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs