ITAC Assessment: ST0042
ITAC logo
ITAC Assessment: ST0042
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product FITNESS & EXERCISE MACH.
NAICS
n/a
SIC 3499: Fabricated Metal Products, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 85
Plant Area
n/a
Annual Production 40,000
pieces
Production Hrs. Annual 2,100
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $97,578 563,306
kWh
Natural Gas $43,508 6,383
MMBtu
Fuel Oil #2 $22,821 3,261
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $14,728 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,347

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $3,822 $810 $3,822
21,981
kWh
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,086 $200 $5,086
29,308
kWh
- -
03 2.4221: Install compressor air intakes in coolest locations $350 $110 $350
2,052
kWh
- -
04 2.4133: Use most efficient type of electric motors $1,863 $2,700 $1,863
10,844
kWh
- -
05 2.1233: Analyze flue gas for proper air/fuel ratio $799 $537 - - $799
-
MMBtu
06 2.1123: Install automatic stack damper $1,762 $1,640 - - $1,762
-
MMBtu
07 2.7441: Replace broken windows and/or window sash $599 $70 - - $599
-
MMBtu
08 2.9112: Use solar heat to heat water $447 - - $447
-
MMBtu
-
TOTAL RECOMMENDED $14,728 $6,067 $11,121
64,185
kWh
$447
-
MMBtu
$3,160
-
MMBtu
TOTAL IMPLEMENTED $8,347 $3,507 $6,949
40,152
kWh
- $1,398
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs