Assessment Year | 1985 |
---|---|
Principal Product | FITNESS & EXERCISE MACH. |
NAICS |
n/a
|
SIC | 3499: Fabricated Metal Products, Not Elsewhere Classified |
Sales Range | $1 M to 5M |
# of Employees | 85 |
Plant Area |
n/a
|
Annual Production | 40,000
pieces
|
Production Hrs. Annual | 2,100
hrs
|
Location (State) | New York |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $97,578 | 563,306 |
kWh
|
$0.17 |
Natural Gas | $43,508 | 6,383 |
MMBtu
|
$6.82 |
Fuel Oil #2 | $22,821 | 3,261 |
MMBtu
|
$7.00 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $14,728 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $8,347 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #2 Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,822 | $810 |
$3,822
21,981
kWh
|
- | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,086 | $200 |
$5,086
29,308
kWh
|
- | - | |
03 | 2.4221: Install compressor air intakes in coolest locations | $350 | $110 |
$350
2,052
kWh
|
- | - | |
04 | 2.4133: Use most efficient type of electric motors | $1,863 | $2,700 |
$1,863
10,844
kWh
|
- | - | |
05 | 2.1233: Analyze flue gas for proper air/fuel ratio | $799 | $537 | - | - |
$799
-
MMBtu
|
|
06 | 2.1123: Install automatic stack damper | $1,762 | $1,640 | - | - |
$1,762
-
MMBtu
|
|
07 | 2.7441: Replace broken windows and/or window sash | $599 | $70 | - | - |
$599
-
MMBtu
|
|
08 | 2.9112: Use solar heat to heat water | $447 | - | - |
$447
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $14,728 | $6,067 |
$11,121
64,185
kWh
|
$447
-
MMBtu
|
$3,160
-
MMBtu
|
||
TOTAL IMPLEMENTED | $8,347 | $3,507 |
$6,949
40,152
kWh
|
- |
$1,398
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #2 Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs