Assessment Year 1985
Principal Product TEXTILE BAGS
NAICS
n/a
SIC 2393: Textile Bags
Sales Range $1
M
to 5
M
# of Employees 54
Plant Area
n/a
Annual Production 5,000,000
pieces
Production Hrs. Annual 2,718
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $26,140 233,001
kWh
Natural Gas $13,866 1,925
MMBtu
Fuel Oil #2 $30,495 4,760
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $15,472 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,472

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,649 $220 $1,649
14,654
kWh
- -
02 2.3191: Use demand controller or load shedder $918 $1,900 $918
-
kWh
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,489 $24 $1,489
13,189
kWh
- -
04 2.4221: Install compressor air intakes in coolest locations $61 $60 $61
586
kWh
- -
05 2.4231: Reduce the pressure of compressed air to the minimum required $207 - $207
1,758
kWh
- -
06 2.4227: Use compressor air filters $136 $80 $136
1,172
kWh
- -
07 2.4133: Use most efficient type of electric motors $232 $225 $232
2,052
kWh
- -
08 2.4312: Improve lubrication practices $1,044 $800 $1,044
9,379
kWh
- -
09 2.2437: Recover waste heat from equipment $413 $600 - - $413
-
MMBtu
10 2.1233: Analyze flue gas for proper air/fuel ratio $691 $537 - - $691
-
MMBtu
11 2.2511: Insulate bare equipment $1,068 $944 - $1,068
-
MMBtu
-
12 2.7441: Replace broken windows and/or window sash $171 $74 - - $171
-
MMBtu
13 2.1311: Replace electrically-operated equipment with fossil fuel equipment $539 $1,450 $743
6,741
kWh
$(-204.0)
-
MMBtu
-
14 2.7245: Use direct air supply to exhaust hoods $6,854 $1,500 - - $6,854
-
MMBtu
TOTAL RECOMMENDED $15,472 $8,414 $6,479
49,531
kWh
$864
-
MMBtu
$8,129
-
MMBtu
TOTAL IMPLEMENTED $5,472 $1,939 $3,542
31,359
kWh
$1,068
-
MMBtu
$862
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs