ITAC Assessment: ST0019
ITAC logo
ITAC Assessment: ST0019
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product CAST ACRYLIC SHEETS
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 75
Plant Area
n/a
Annual Production 25,000
pieces
Production Hrs. Annual 4,800
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $150,972 1,793,963
kWh
Natural Gas $30,048 4,846
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $25,783 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $24,450

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,367 $1,116 $2,367
28,136
kWh
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,428 $56 $3,428
40,739
kWh
-
03 2.1123: Install automatic stack damper $1,259 $856 - $1,259
-
MMBtu
04 2.2511: Insulate bare equipment $691 $300 $691
8,206
kWh
-
05 2.2515: Use optimum thickness insulation $541 $240 - $541
-
MMBtu
06 2.6218: Turn off equipment when not in use $666 $150 $666
7,913
kWh
-
07 2.4221: Install compressor air intakes in coolest locations $74 $55 $74
879
kWh
-
08 2.7224: Reduce space conditioning during non-working hours $1,350 - - $1,350
-
MMBtu
09 2.4227: Use compressor air filters $148 $40 $148
1,758
kWh
-
10 2.2437: Recover waste heat from equipment $274 $500 - $274
-
MMBtu
11 2.7447: Install vinyl strip / high speed / air curtain doors $906 $175 - $906
-
MMBtu
12 2.3131: Reschedule plant operations or reduce load to avoid peaks $9,567 $1,900 $9,567
-
kWh
-
13 2.1233: Analyze flue gas for proper air/fuel ratio $1,654 $537 - $1,654
-
MMBtu
14 2.6218: Turn off equipment when not in use $2,858 $150 - $2,858
-
MMBtu
TOTAL RECOMMENDED $25,783 $6,075 $16,941
87,631
kWh
$8,842
-
MMBtu
TOTAL IMPLEMENTED $24,450 $5,164 $16,867
86,752
kWh
$7,583
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs