ITAC Assessment: ST0018
ITAC logo
ITAC Assessment: ST0018
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product WIRE & CABLE PRODUCTS
NAICS
n/a
SIC 3357: Drawing and Insulating of Nonferrous Wire
Sales Range $1
M
to 5
M
# of Employees 89
Plant Area
n/a
Annual Production 600,000
lb
Production Hrs. Annual 5,304
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $129,153 1,446,073
kWh
LPG $543 28
MMBtu
Fuel Oil #2 $34,886 4,732
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $34,436 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $21,564

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings LPG Savings Fuel Oil #2 Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $8,967 $2,258 $8,967
100,528
kWh
- - -
02 2.6121: Reduce hot water temperature to the minimum required $679 - $450
4,982
kWh
- $229
-
MMBtu
-
03 2.1311: Replace electrically-operated equipment with fossil fuel equipment $533 $750 $824
9,086
kWh
$(-291.0)
-
MMBtu
- -
04 2.1332: Convert combustion equipment to burn natural gas $200 $100 - $(-114.0)
-
MMBtu
$314
-
MMBtu
-
05 2.7447: Install vinyl strip / high speed / air curtain doors $1,502 $453 - - - $1,502
-
MMBtu
06 2.3191: Use demand controller or load shedder $6,390 $1,900 $6,390
-
kWh
- - -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $10,356 $128 $10,356
116,647
kWh
- - -
08 2.1123: Install automatic stack damper $2,670 $1,350 - - - $2,670
-
MMBtu
09 2.1233: Analyze flue gas for proper air/fuel ratio $2,038 $537 - - - $2,038
-
MMBtu
10 2.2511: Insulate bare equipment $599 $1,263 - - - $599
-
MMBtu
11 2.4221: Install compressor air intakes in coolest locations $502 $100 $502
5,569
kWh
- - -
TOTAL RECOMMENDED $34,436 $8,839 $27,489
236,812
kWh
$(-405.0)
-
MMBtu
$543
-
MMBtu
$6,809
-
MMBtu
TOTAL IMPLEMENTED $21,564 $4,281 $17,196
121,629
kWh
- $229
-
MMBtu
$4,139
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings LPG Savings Fuel Oil #2 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs