ITAC Assessment: OD0029
ITAC logo
ITAC Assessment: OD0029
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Hardwood Veneer
NAICS
n/a
SIC 2435: Hardwood Veneer and Plywood
Sales Range $1
M
to 5
M
# of Employees 57
Plant Area 81,600
ft2
Annual Production 1,100
thousand feet
Production Hrs. Annual 2,125
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $122,194 1,437,573
kWh
Wood $89,358 76,592
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $31,750 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,045

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Wood Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $16,168 $5,356 $2,225
26,084
kWh
$13,943
-
MMBtu
02 2.7142: Utilize higher efficiency lamps and/or ballasts $9,341 $5,389 $9,341
109,906
kWh
-
03 2.2136: Install / repair insulation on steam lines $582 $360 - $582
-
MMBtu
04 2.4133: Use most efficient type of electric motors $1,739 $1,895 $1,739
20,516
kWh
-
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,457 $1,773 $2,457
29,015
kWh
-
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,463 $800 $1,463
17,292
kWh
-
TOTAL RECOMMENDED $31,750 $15,573 $17,225
202,813
kWh
$14,525
-
MMBtu
TOTAL IMPLEMENTED $2,045 $1,160 $1,463
17,292
kWh
$582
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Wood Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs