ITAC Assessment: WM0224
ITAC logo
ITAC Assessment: WM0224
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Electronic Control Manufacturer
NAICS 334417: Electronic Connector Manufacturing
SIC 3678: Electronic Connectors
Sales Range $10
M
to 50
M
# of Employees 35
Plant Area 25,000
ft2
Annual Production 3,500
pieces
Production Hrs. Annual 2,400
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $63,844 598,721
kWh
Electricity Demand $24,086 3,178
kW-mo/yr
Electricity Fees $19,685 -
Natural Gas $12,370 1,750
MMBtu
Waste Disposal Costs
Water Usage $8,740 2,102
Tgal
TOTAL YEARLY COSTS $128,725
RECOMMENDED SAVINGS* $6,030 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $4,315 $5,877 $3,373
31,528
kWh
$942
-
kW-mo/yr
-
02 2.4231: Reduce the pressure of compressed air to the minimum required $1,148 - $848
7,923
kWh
$300
-
kW-mo/yr
-
03 2.7444: Close holes and openings in building such as broken windows $464 $603 - - $464
-
MMBtu
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $102 $103 $76
706
kWh
$27
-
kW-mo/yr
-
TOTAL RECOMMENDED $6,030 $6,583 $4,297
40,157
kWh
$1,269
-
kW-mo/yr
$464
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs