Assessment Year | 2004 |
---|---|
Principal Product | prefinished sheet metal |
NAICS | 332812: Metal Coating, Engraving (except Jewelry and Silverware), and Allied Services to Manufacturers |
SIC | 3411: Metal Cans |
Sales Range | $10 M to 50M |
# of Employees | 45 |
Plant Area |
95,000
ft2
|
Annual Production | 74
Tgal
|
Production Hrs. Annual | 2,600
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $76,388 | 1,010,272 |
kWh
|
$0.076 |
Electricity Demand | $39,585 | 4,625 |
kW-mo/yr
|
$8.56 |
Natural Gas | $161,463 | 33,690 |
MMBtu
|
$4.79 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $88,799 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $35,870 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $33,786 | $68,250 |
$21,888
289,529
kWh
|
$11,898
-
kW-mo/yr
|
- | |
02 | 2.2414: Use waste heat from hot flue gases to preheat | $19,143 | $43,000 | - | - |
$19,143
-
MMBtu
|
|
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $19,424 | $320 |
$10,085
133,403
kWh
|
$9,339
-
kW-mo/yr
|
- | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $15,367 | $18,600 |
$9,957
131,710
kWh
|
$5,410
-
kW-mo/yr
|
- | |
05 | 2.4133: Use most efficient type of electric motors | $1,079 | $398 |
$699
9,246
kWh
|
$380
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $88,799 | $130,568 |
$42,629
563,888
kWh
|
$27,027
-
kW-mo/yr
|
$19,143
-
MMBtu
|
||
TOTAL IMPLEMENTED | $35,870 | $19,318 |
$20,741
274,359
kWh
|
$15,129
-
kW-mo/yr
|
- |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs