ITAC Assessment: SD0354
ITAC logo
ITAC Assessment: SD0354
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product prefinished sheet metal
NAICS 332812: Metal Coating, Engraving (except Jewelry and Silverware), and Allied Services to Manufacturers
SIC 3411: Metal Cans
Sales Range $10
M
to 50
M
# of Employees 45
Plant Area 95,000
ft2
Annual Production 74
Tgal
Production Hrs. Annual 2,600
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $76,388 1,010,272
kWh
Electricity Demand $39,585 4,625
kW-mo/yr
Natural Gas $161,463 33,690
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $88,799 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $35,870

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $33,786 $68,250 $21,888
289,529
kWh
$11,898
-
kW-mo/yr
-
02 2.2414: Use waste heat from hot flue gases to preheat $19,143 $43,000 - - $19,143
-
MMBtu
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $19,424 $320 $10,085
133,403
kWh
$9,339
-
kW-mo/yr
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $15,367 $18,600 $9,957
131,710
kWh
$5,410
-
kW-mo/yr
-
05 2.4133: Use most efficient type of electric motors $1,079 $398 $699
9,246
kWh
$380
-
kW-mo/yr
-
TOTAL RECOMMENDED $88,799 $130,568 $42,629
563,888
kWh
$27,027
-
kW-mo/yr
$19,143
-
MMBtu
TOTAL IMPLEMENTED $35,870 $19,318 $20,741
274,359
kWh
$15,129
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs