ITAC Assessment: ST0011
ITAC logo
ITAC Assessment: ST0011
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1984
Principal Product METAL SQUEEZE TUBES
NAICS
n/a
SIC 3499: Fabricated Metal Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 65
Plant Area
n/a
Annual Production 1,200,000
lb
Production Hrs. Annual 2,375
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $57,680 545,135
kWh
Natural Gas $19,811 3,088
MMBtu
Fuel Oil #2 $13,825 1,820
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,575 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,427

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings
01 2.7221: Lower temperature during the winter season and vice-versa $4,259 - - - $4,259
-
MMBtu
02 2.1233: Analyze flue gas for proper air/fuel ratio $148 $537 - - $148
-
MMBtu
03 2.7441: Replace broken windows and/or window sash $1,083 $190 - - $1,083
-
MMBtu
04 2.2136: Install / repair insulation on steam lines $2,107 $2,290 - - $2,107
-
MMBtu
05 2.6121: Reduce hot water temperature to the minimum required $138 - - $138
-
MMBtu
-
06 2.4221: Install compressor air intakes in coolest locations $93 $45 $93
879
kWh
- -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,210 $56 $1,210
11,430
kWh
- -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $869 $435 $869
8,206
kWh
- -
09 2.2437: Recover waste heat from equipment $668 $500 - - $668
-
MMBtu
TOTAL RECOMMENDED $10,575 $4,053 $2,172
20,515
kWh
$138
-
MMBtu
$8,265
-
MMBtu
TOTAL IMPLEMENTED $10,427 $3,516 $2,172
20,515
kWh
$138
-
MMBtu
$8,117
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs