Assessment Year | 1984 |
---|---|
Principal Product | METAL SQUEEZE TUBES |
NAICS |
n/a
|
SIC | 3499: Fabricated Metal Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 65 |
Plant Area |
n/a
|
Annual Production | 1,200,000
lb
|
Production Hrs. Annual | 2,375
hrs
|
Location (State) | New Jersey |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $57,680 | 545,135 |
kWh
|
$0.11 |
Natural Gas | $19,811 | 3,088 |
MMBtu
|
$6.42 |
Fuel Oil #2 | $13,825 | 1,820 |
MMBtu
|
$7.60 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $10,575 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $10,427 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #2 Savings |
---|---|---|---|---|---|---|---|
01 | 2.7221: Lower temperature during the winter season and vice-versa | $4,259 | - | - | - |
$4,259
-
MMBtu
|
|
02 | 2.1233: Analyze flue gas for proper air/fuel ratio | $148 | $537 | - | - |
$148
-
MMBtu
|
|
03 | 2.7441: Replace broken windows and/or window sash | $1,083 | $190 | - | - |
$1,083
-
MMBtu
|
|
04 | 2.2136: Install / repair insulation on steam lines | $2,107 | $2,290 | - | - |
$2,107
-
MMBtu
|
|
05 | 2.6121: Reduce hot water temperature to the minimum required | $138 | - | - |
$138
-
MMBtu
|
- | |
06 | 2.4221: Install compressor air intakes in coolest locations | $93 | $45 |
$93
879
kWh
|
- | - | |
07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,210 | $56 |
$1,210
11,430
kWh
|
- | - | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $869 | $435 |
$869
8,206
kWh
|
- | - | |
09 | 2.2437: Recover waste heat from equipment | $668 | $500 | - | - |
$668
-
MMBtu
|
|
TOTAL RECOMMENDED | $10,575 | $4,053 |
$2,172
20,515
kWh
|
$138
-
MMBtu
|
$8,265
-
MMBtu
|
||
TOTAL IMPLEMENTED | $10,427 | $3,516 |
$2,172
20,515
kWh
|
$138
-
MMBtu
|
$8,117
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #2 Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs