ITAC Assessment: IC0268
ITAC logo
ITAC Assessment: IC0268
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Rehabilitation
NAICS 622310: Specialty (except Psychiatric and Substance Abuse) Hospitals
SIC 8093: Specialty Outpatient Facilities, Not Elsewhere Classified
Sales Range less than $500
k
# of Employees 40
Plant Area 139,869
ft2
Annual Production 1
units
Production Hrs. Annual 8,760
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $226,845 2,268,447
kWh
Natural Gas $1,651 86
MMBtu
TOTAL YEARLY COSTS $228,496
RECOMMENDED SAVINGS* $7,668 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,733

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $591 $1,330 $591
5,905
kWh
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,935 $205 $1,935
19,354
kWh
03 2.7142: Utilize higher efficiency lamps and/or ballasts $4,827 $7,200 $4,827
48,267
kWh
04 2.4133: Use most efficient type of electric motors $315 $1,040 $315
3,154
kWh
TOTAL RECOMMENDED $7,668 $9,775 $7,668
76,680
kWh
TOTAL IMPLEMENTED $5,733 $9,570 $5,733
57,326
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs