ITAC Assessment: GT0584
ITAC logo
ITAC Assessment: GT0584
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Carpet
NAICS
n/a
SIC 2273: Carpets and Rugs
Sales Range $100
M
to 500
M
# of Employees 200
Plant Area 480,000
ft2
Annual Production 10,000
thousand feet
Production Hrs. Annual 6,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $382,698 13,076,788
kWh
Electricity Fees $20,142 -
Natural Gas $431,680 137,950
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $256,090 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $76,820

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Natural Gas Savings Solid Waste (non-haz) Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $8,430 $40,190 $8,008
274,619
kWh
$422 - -
02 2.4133: Use most efficient type of electric motors $1,510 $22,150 $1,434
49,238
kWh
$76 - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,430 $350 $2,308
78,839
kWh
$122 - -
04 2.4224: Upgrade controls on compressors $34,600 $7,000 $32,870
1,122,509
kWh
$1,730 - -
05 2.4231: Reduce the pressure of compressed air to the minimum required $12,600 - $11,970
410,317
kWh
$630 - -
06 2.8113: Purchase gas directly from a contract gas supplier $52,000 - - - $52,000
-
MMBtu
-
07 2.1233: Analyze flue gas for proper air/fuel ratio $11,300 - - - $11,300
-
MMBtu
-
08 2.7111: Reduce illumination to minimum necessary levels $1,150 - $1,092
37,222
kWh
$58 - -
09 2.1232: Keep boiler tubes clean $8,890 - - - $8,890
-
MMBtu
-
10 3.1161: Eliminate/reduce an operation $123,180 $600,000 - - - $123,180
-
lb
TOTAL RECOMMENDED $256,090 $669,690 $57,682
1,972,744
kWh
$3,038 $72,190
-
MMBtu
$123,180
-
lb
TOTAL IMPLEMENTED $76,820 $62,690 $12,842
439,918
kWh
$678 $63,300
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings Natural Gas Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs