Assessment Year | 1984 |
---|---|
Principal Product | METAL ELECTRONIC COMPONENTS |
NAICS |
n/a
|
SIC | 3469: Metal Stampings, Not Elsewhere Classified |
Sales Range | $1 M to 5M |
# of Employees | 80 |
Plant Area |
n/a
|
Annual Production | 750,000
pieces
|
Production Hrs. Annual | 3,300
hrs
|
Location (State) | New Jersey |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $38,354 | 339,097 |
kWh
|
$0.11 |
Natural Gas | $7,485 | 1,052 |
MMBtu
|
$7.12 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $16,194 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $15,244 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.6121: Reduce hot water temperature to the minimum required | $306 | - |
$168
1,465
kWh
|
$138
-
MMBtu
|
|
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,941 | $40 |
$4,941
43,669
kWh
|
- | |
03 | 2.7447: Install vinyl strip / high speed / air curtain doors | $845 | $80 |
$285
2,638
kWh
|
$560
-
MMBtu
|
|
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,150 | $310 |
$2,150
19,050
kWh
|
- | |
05 | 2.4221: Install compressor air intakes in coolest locations | $386 | $182 |
$386
3,517
kWh
|
- | |
06 | 2.1233: Analyze flue gas for proper air/fuel ratio | $450 | $537 | - |
$450
-
MMBtu
|
|
07 | 2.6212: Turn off equipment during breaks, reduce operating time | $584 | $420 |
$584
5,275
kWh
|
- | |
08 | 2.6212: Turn off equipment during breaks, reduce operating time | $3,455 | $1,800 |
$3,455
30,481
kWh
|
- | |
09 | 2.1123: Install automatic stack damper | $564 | $282 | - |
$564
-
MMBtu
|
|
10 | 2.6214: Shut off pilots in standby equipment | $296 | - | - |
$296
-
MMBtu
|
|
11 | 2.2437: Recover waste heat from equipment | $147 | $370 | - |
$147
-
MMBtu
|
|
12 | 2.7221: Lower temperature during the winter season and vice-versa | $2,070 | - |
$1,104
9,672
kWh
|
$966
-
MMBtu
|
|
TOTAL RECOMMENDED | $16,194 | $4,021 |
$13,073
115,767
kWh
|
$3,121
-
MMBtu
|
||
TOTAL IMPLEMENTED | $15,244 | $3,557 |
$12,687
112,250
kWh
|
$2,557
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs