ITAC Assessment: CI0010
ITAC logo
ITAC Assessment: CI0010
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Electronics Recycling
NAICS 423620: Household Appliances, Electric Housewares, and Consumer Electronics Merchant Wholesalers
SIC 5064: Electrical Appliances, Television and Radio Sets
Sales Range $5
M
to 10
M
# of Employees 35
Plant Area 94,176
ft2
Annual Production 480,000
pieces
Production Hrs. Annual 2,210
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $48,159 273,120
kWh
Electricity Demand $13,327 1,222
kW-mo/yr
Electricity Fees $7,767 -
Natural Gas $826 307
MMBtu
LPG $2,908 1
MMBtu
Waste Disposal Costs
Water Usage $4,972 452
Tgal
Water Disposal $3,274 452
Tgal
Solid Waste (non-haz) $13,792 1
lb
TOTAL YEARLY COSTS $95,025
RECOMMENDED SAVINGS* $45,802 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $32,863

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $18,279 $12,078 $15,117
85,587
kWh
$3,162
-
kW-mo/yr
02 2.9114: Use solar heat to make electricty $13,459 $115,417 $10,793
61,108
kWh
$2,666
-
kW-mo/yr
03 2.7491: Insulate glazing, walls, ceilings, and roofs $7,488 $12,300 $7,488
42,393
kWh
-
04 2.6218: Turn off equipment when not in use $4,003 - $4,003
22,664
kWh
-
05 2.7135: Install occupancy sensors $1,203 $500 $801
4,535
kWh
$402
-
kW-mo/yr
06 2.3132: Recharge batteries on during off-peak demand periods $1,125 $50 - $1,125
-
kW-mo/yr
07 2.6218: Turn off equipment when not in use $245 - $245
1,385
kWh
-
TOTAL RECOMMENDED $45,802 $140,345 $38,447
217,672
kWh
$7,355
-
kW-mo/yr
TOTAL IMPLEMENTED $32,863 $127,545 $25,910
146,695
kWh
$6,953
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs