Assessment Year | 1984 |
---|---|
Principal Product | DRAFTING FURN. & EQUIPMENT |
NAICS |
n/a
|
SIC | 2531: Public Building and Related Furniture |
Sales Range | $10 M to 50M |
# of Employees | 140 |
Plant Area |
n/a
|
Annual Production | 2,500,000
pieces
|
Production Hrs. Annual | 2,375
hrs
|
Location (State) | New Jersey |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $64,117 | 677,315 |
kWh
|
$0.095 |
Natural Gas | $66,781 | 10,837 |
MMBtu
|
$6.16 |
Fuel Oil #2 | $6,672 | 861 |
MMBtu
|
$7.75 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $32,619 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $12,951 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #2 Savings |
---|---|---|---|---|---|---|---|
01 | 2.6121: Reduce hot water temperature to the minimum required | $31 | - | - |
$31
-
MMBtu
|
- | |
02 | 2.1233: Analyze flue gas for proper air/fuel ratio | $692 | $537 | - |
$692
-
MMBtu
|
- | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $6,350 | $88 |
$6,350
67,116
kWh
|
- | - | |
04 | 2.7447: Install vinyl strip / high speed / air curtain doors | $13,166 | - | - |
$11,969
-
MMBtu
|
$1,197
-
MMBtu
|
|
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,130 | $3,299 |
$2,130
22,567
kWh
|
- | - | |
06 | 2.4221: Install compressor air intakes in coolest locations | $300 | $65 |
$300
3,224
kWh
|
- | - | |
07 | 2.7229: Air condition only space necessary | $846 | $675 | - |
$846
-
MMBtu
|
- | |
08 | 2.1123: Install automatic stack damper | $923 | $658 | - |
$923
-
MMBtu
|
- | |
09 | 2.7224: Reduce space conditioning during non-working hours | $2,902 | - | - |
$2,639
-
MMBtu
|
$263
-
MMBtu
|
|
10 | 2.2136: Install / repair insulation on steam lines | $4,345 | - | - |
$3,950
-
MMBtu
|
$395
-
MMBtu
|
|
11 | 2.7243: Improve air circulation with destratification fans / other methods | $934 | - |
$(-231.0)
(-2,345)
kWh
|
$1,165
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $32,619 | $5,322 |
$8,549
90,562
kWh
|
$22,215
-
MMBtu
|
$1,855
-
MMBtu
|
||
TOTAL IMPLEMENTED | $12,951 | $4,599 |
$8,480
89,683
kWh
|
$4,208
-
MMBtu
|
$263
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #2 Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs