ITAC Assessment: ST0001
ITAC logo
ITAC Assessment: ST0001
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1984
Principal Product DRAFTING FURN. & EQUIPMENT
NAICS
n/a
SIC 2531: Public Building and Related Furniture
Sales Range $10
M
to 50
M
# of Employees 140
Plant Area
n/a
Annual Production 2,500,000
pieces
Production Hrs. Annual 2,375
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $64,117 677,315
kWh
Natural Gas $66,781 10,837
MMBtu
Fuel Oil #2 $6,672 861
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $32,619 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,951

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings
01 2.6121: Reduce hot water temperature to the minimum required $31 - - $31
-
MMBtu
-
02 2.1233: Analyze flue gas for proper air/fuel ratio $692 $537 - $692
-
MMBtu
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,350 $88 $6,350
67,116
kWh
- -
04 2.7447: Install vinyl strip / high speed / air curtain doors $13,166 - - $11,969
-
MMBtu
$1,197
-
MMBtu
05 2.7142: Utilize higher efficiency lamps and/or ballasts $2,130 $3,299 $2,130
22,567
kWh
- -
06 2.4221: Install compressor air intakes in coolest locations $300 $65 $300
3,224
kWh
- -
07 2.7229: Air condition only space necessary $846 $675 - $846
-
MMBtu
-
08 2.1123: Install automatic stack damper $923 $658 - $923
-
MMBtu
-
09 2.7224: Reduce space conditioning during non-working hours $2,902 - - $2,639
-
MMBtu
$263
-
MMBtu
10 2.2136: Install / repair insulation on steam lines $4,345 - - $3,950
-
MMBtu
$395
-
MMBtu
11 2.7243: Improve air circulation with destratification fans / other methods $934 - $(-231.0)
(-2,345)
kWh
$1,165
-
MMBtu
-
TOTAL RECOMMENDED $32,619 $5,322 $8,549
90,562
kWh
$22,215
-
MMBtu
$1,855
-
MMBtu
TOTAL IMPLEMENTED $12,951 $4,599 $8,480
89,683
kWh
$4,208
-
MMBtu
$263
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs