Assessment Year | 2025 |
---|---|
Principal Product | Aircraft |
NAICS | 336411: Aircraft Manufacturing |
SIC | 3721: Aircraft |
Sales Range | $1 M to 5M |
# of Employees | 495 |
Plant Area |
713,000
ft2
|
Annual Production | 100
units
|
Production Hrs. Annual | 3,744
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $789,202 | 4,372,866 |
kWh
|
$0.18 |
Electricity Demand | $643,420 | 18,169 |
kW-mo/yr
|
$35.41 |
Natural Gas | $105,507 | 5,275 |
MMBtu
|
$20.00 |
TOTAL YEARLY COSTS | $1,538,129 | |||
RECOMMENDED SAVINGS* | $602,419 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $6,317 | - |
$6,317
35,097
kWh
|
- | - | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,664 | - |
$5,664
31,467
kWh
|
- | - | - | |
03 | 2.4221: Install compressor air intakes in coolest locations | $369 | $1,363 |
$369
2,051
kWh
|
- | - | - | |
04 | 2.2437: Recover waste heat from equipment | $6,680 | $1,717 | - | - |
$6,680
-
MMBtu
|
- | |
05 | 4.212: Adopt in-house material generation | $320,339 | $149,572 |
$(-4,598.0)
(-25,542)
kWh
|
$(-1,667.0)
-
kW-mo/yr
|
- | $326,604 | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,616 | $7,758 |
$2,831
15,725
kWh
|
$1,785
-
kW-mo/yr
|
- | - | |
07 | 2.9114: Use solar heat to make electricty | $257,368 | $1,284,211 |
$204,252
1,134,744
kWh
|
$53,116
-
kW-mo/yr
|
- | - | |
08 | 2.7221: Lower temperature during the winter season and vice-versa | $1,066 | - | - | - |
$1,066
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $602,419 | $1,444,621 |
$214,835
1,193,542
kWh
|
$53,234
-
kW-mo/yr
|
$7,746
-
MMBtu
|
$326,604 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs