| Assessment Year | 2025 |
|---|---|
| Principal Product | Aircraft |
| NAICS | 336411: Aircraft Manufacturing |
| SIC | 3721: Aircraft |
| Sales Range | $1 M to 5M |
| # of Employees | 495 |
| Plant Area |
713,000
ft2
|
| Annual Production | 100
units
|
| Production Hrs. Annual | 3,744
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $789,202 | 4,372,866 |
kWh
|
$0.18 |
| Electricity Demand | $643,420 | 18,169 |
kW-mo/yr
|
$35.41 |
| Natural Gas | $105,507 | 5,275 |
MMBtu
|
$20.00 |
| TOTAL YEARLY COSTS | $1,538,129 | |||
| RECOMMENDED SAVINGS* | $602,419 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $6,317 | - |
$6,317
35,097
kWh
|
- | - | - | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,664 | - |
$5,664
31,467
kWh
|
- | - | - | |
| 03 | 2.4221: Install compressor air intakes in coolest locations | $369 | $1,363 |
$369
2,051
kWh
|
- | - | - | |
| 04 | 2.2437: Recover waste heat from equipment | $6,680 | $1,717 | - | - |
$6,680
-
MMBtu
|
- | |
| 05 | 4.212: Adopt in-house material generation | $320,339 | $149,572 |
$(-4,598.0)
(-25,542)
kWh
|
$(-1,667.0)
-
kW-mo/yr
|
- | $326,604 | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,616 | $7,758 |
$2,831
15,725
kWh
|
$1,785
-
kW-mo/yr
|
- | - | |
| 07 | 2.9114: Use solar heat to make electricty | $257,368 | $1,284,211 |
$204,252
1,134,744
kWh
|
$53,116
-
kW-mo/yr
|
- | - | |
| 08 | 2.7221: Lower temperature during the winter season and vice-versa | $1,066 | - | - | - |
$1,066
-
MMBtu
|
- | |
| TOTAL RECOMMENDED | $602,419 | $1,444,621 |
$214,835
1,193,542
kWh
|
$53,234
-
kW-mo/yr
|
$7,746
-
MMBtu
|
$326,604 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs