Assessment Year | 2023 |
---|---|
Principal Product | Prestressed Concrete Products, Precast Concrete Products, Various Concrete Products |
NAICS | 327390: Other Concrete Product Manufacturing |
SIC | 3272: Concrete Products, Except Block and Brick |
Sales Range | $10 M to 50M |
# of Employees | 91 |
Plant Area |
871,000
ft2
|
Annual Production | 4,313
Tgal
|
Production Hrs. Annual | 2,470
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $71,730 | 315,493 |
kWh
|
$0.23 | |
Electricity Demand | $20,220 | 1,242 |
kW-mo/yr
|
$16.28 | |
Natural Gas | $120,107 | 7,250 |
MMBtu
|
$16.57 | |
LPG | $76,535 | 2,529 |
MMBtu
|
$30.27 | |
Fuel Oil #1 | $56,657 | 11,779 |
MMBtu
|
$4.81 | |
Waste Disposal Costs | |||||
Water Usage | $7,714 | 845 |
Tgal
|
$9.13 | |
TOTAL YEARLY COSTS | $352,963 | ||||
RECOMMENDED SAVINGS* | $21,848 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $21,589 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.9114: Use solar heat to make electricty | $18,246 | $90,267 |
$17,468
76,830
kWh
|
$388
-
kW-mo/yr
|
$390 | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,544 | $238 |
$299
1,315
kWh
|
$1,245
-
kW-mo/yr
|
- | - | |
03 | 2.4221: Install compressor air intakes in coolest locations | $96 | $171 |
$70
309
kWh
|
$26
-
kW-mo/yr
|
- | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,799 | $3,878 |
$1,273
5,597
kWh
|
$526
-
kW-mo/yr
|
- | - | |
05 | 2.7221: Lower temperature during the winter season and vice-versa | $163 | - | - | - | - |
$163
-
MMBtu
|
|
TOTAL RECOMMENDED | $21,848 | $94,554 |
$19,110
84,051
kWh
|
$2,185
-
kW-mo/yr
|
$390 |
$163
-
MMBtu
|
||
TOTAL IMPLEMENTED | $21,589 | $94,383 |
$19,040
83,742
kWh
|
$2,159
-
kW-mo/yr
|
$390 | - |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs