ITAC Assessment: SJ0004
ITAC logo
ITAC Assessment: SJ0004
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Prestressed Concrete Products, Precast Concrete Products, Various Concrete Products
NAICS 327390: Other Concrete Product Manufacturing
SIC 3272: Concrete Products, Except Block and Brick
Sales Range $10
M
to 50
M
# of Employees 91
Plant Area 871,000
ft2
Annual Production 4,313
Tgal
Production Hrs. Annual 2,470
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $71,730 315,493
kWh
Electricity Demand $20,220 1,242
kW-mo/yr
Natural Gas $120,107 7,250
MMBtu
LPG $76,535 2,529
MMBtu
Fuel Oil #1 $56,657 11,779
MMBtu
Waste Disposal Costs
Water Usage $7,714 845
Tgal
TOTAL YEARLY COSTS $352,963
RECOMMENDED SAVINGS* $21,848 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $21,589

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.9114: Use solar heat to make electricty $18,246 $90,267 $17,468
76,830
kWh
$388
-
kW-mo/yr
$390 -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,544 $238 $299
1,315
kWh
$1,245
-
kW-mo/yr
- -
03 2.4221: Install compressor air intakes in coolest locations $96 $171 $70
309
kWh
$26
-
kW-mo/yr
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,799 $3,878 $1,273
5,597
kWh
$526
-
kW-mo/yr
- -
05 2.7221: Lower temperature during the winter season and vice-versa $163 - - - - $163
-
MMBtu
TOTAL RECOMMENDED $21,848 $94,554 $19,110
84,051
kWh
$2,185
-
kW-mo/yr
$390 $163
-
MMBtu
TOTAL IMPLEMENTED $21,589 $94,383 $19,040
83,742
kWh
$2,159
-
kW-mo/yr
$390 -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs