ITAC Assessment: IA0356
ITAC logo
ITAC Assessment: IA0356
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product automotive parts
NAICS 336320: Motor Vehicle Electrical and Electronic Equipment Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $100
M
to 500
M
# of Employees 340
Plant Area 135,375
ft2
Annual Production 22,000,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Minnesota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $187,611 5,567,114
kWh
Electricity Demand $101,674 13,320
kW-mo/yr
Electricity Fees $10,798 -
Natural Gas $29,149 3,642
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $12,121 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,261

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,212 $349 $808
23,838
kWh
$404
-
kW-mo/yr
02 2.6212: Turn off equipment during breaks, reduce operating time $2,880 $200 $1,604
47,531
kWh
$1,276
-
kW-mo/yr
03 2.6218: Turn off equipment when not in use $1,645 $2,290 $369
10,957
kWh
$1,276
-
kW-mo/yr
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,734 $6,677 $1,543
45,760
kWh
$1,191
-
kW-mo/yr
05 2.7142: Utilize higher efficiency lamps and/or ballasts $536 $752 $353
10,446
kWh
$183
-
kW-mo/yr
06 2.7135: Install occupancy sensors $2,860 $4,628 $2,860
73,690
kWh
-
07 2.4133: Use most efficient type of electric motors $254 $120 $126
3,726
kWh
$128
-
kW-mo/yr
TOTAL RECOMMENDED $12,121 $15,016 $7,663
215,948
kWh
$4,458
-
kW-mo/yr
TOTAL IMPLEMENTED $9,261 $10,388 $4,803
142,258
kWh
$4,458
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs