| Assessment Year | 2017 |
|---|---|
| Principal Product | Belts |
| NAICS | 326220: Rubber and Plastics Hoses and Belting Manufacturing |
| SIC | 2387: Apparel belts |
| Sales Range | $10 M to 50M |
| # of Employees | 150 |
| Plant Area |
120,000
ft2
|
| Annual Production | 2,135,000
units
|
| Production Hrs. Annual | 2,080
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $77,872 | 515,479 |
kWh
|
$0.15 |
| Electricity Demand | $33,916 | 2,533 |
kW-mo/yr
|
$13.39 |
| Natural Gas | $4,485 | 417 |
MMBtu
|
$10.75 |
| TOTAL YEARLY COSTS | $116,273 | |||
| RECOMMENDED SAVINGS* | $110,150 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $6,460 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,521 | $70 |
$1,045
6,920
kWh
|
$476
-
kW-mo/yr
|
- | - | - | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,014 | - |
$2,854
18,893
kWh
|
- | - | $(-840.0) | - | |
| 03 | 2.7224: Reduce space conditioning during non-working hours | $3,873 | - |
$2,382
15,766
kWh
|
- |
$1,491
-
MMBtu
|
- | - | |
| 04 | 2.4221: Install compressor air intakes in coolest locations | $573 | $425 |
$394
2,610
kWh
|
$179
-
kW-mo/yr
|
- | - | - | |
| 05 | 2.6231: Utilize controls to operate equipment only when needed | $807 | $1,047 |
$807
5,344
kWh
|
- | - | - | - | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $14,760 | $45,819 |
$10,529
69,698
kWh
|
$2,640
-
kW-mo/yr
|
- | $1,328 | $263 | |
| 07 | 2.9114: Use solar heat to make electricty | $86,602 | $530,610 |
$70,453
466,360
kWh
|
$16,149
-
kW-mo/yr
|
- | - | - | |
| TOTAL RECOMMENDED | $110,150 | $577,971 |
$88,464
585,591
kWh
|
$19,444
-
kW-mo/yr
|
$1,491
-
MMBtu
|
$488 | $263 | ||
| TOTAL IMPLEMENTED | $6,460 | $425 |
$5,630
37,269
kWh
|
$179
-
kW-mo/yr
|
$1,491
-
MMBtu
|
$(-840.0) | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs