Assessment Year | 2017 |
---|---|
Principal Product | Belts |
NAICS | 326220: Rubber and Plastics Hoses and Belting Manufacturing |
SIC | 2387: Apparel belts |
Sales Range | $10 M to 50M |
# of Employees | 150 |
Plant Area |
120,000
ft2
|
Annual Production | 2,135,000
units
|
Production Hrs. Annual | 2,080
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $77,872 | 515,479 |
kWh
|
$0.15 |
Electricity Demand | $33,916 | 2,533 |
kW-mo/yr
|
$13.39 |
Natural Gas | $4,485 | 417 |
MMBtu
|
$10.75 |
TOTAL YEARLY COSTS | $116,273 | |||
RECOMMENDED SAVINGS* | $110,150 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $6,460 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,521 | $70 |
$1,045
6,920
kWh
|
$476
-
kW-mo/yr
|
- | - | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,014 | - |
$2,854
18,893
kWh
|
- | - | $(-840.0) | - | |
03 | 2.7224: Reduce space conditioning during non-working hours | $3,873 | - |
$2,382
15,766
kWh
|
- |
$1,491
-
MMBtu
|
- | - | |
04 | 2.4221: Install compressor air intakes in coolest locations | $573 | $425 |
$394
2,610
kWh
|
$179
-
kW-mo/yr
|
- | - | - | |
05 | 2.6231: Utilize controls to operate equipment only when needed | $807 | $1,047 |
$807
5,344
kWh
|
- | - | - | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $14,760 | $45,819 |
$10,529
69,698
kWh
|
$2,640
-
kW-mo/yr
|
- | $1,328 | $263 | |
07 | 2.9114: Use solar heat to make electricty | $86,602 | $530,610 |
$70,453
466,360
kWh
|
$16,149
-
kW-mo/yr
|
- | - | - | |
TOTAL RECOMMENDED | $110,150 | $577,971 |
$88,464
585,591
kWh
|
$19,444
-
kW-mo/yr
|
$1,491
-
MMBtu
|
$488 | $263 | ||
TOTAL IMPLEMENTED | $6,460 | $425 |
$5,630
37,269
kWh
|
$179
-
kW-mo/yr
|
$1,491
-
MMBtu
|
$(-840.0) | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs