ITAC Assessment: SF0495
ITAC logo
ITAC Assessment: SF0495
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Baked Goods
NAICS 311812: Commercial Bakeries
SIC 2051: Bread and Other Bakery Products, Except Cookies and Crackers
Sales Range $10
M
to 50
M
# of Employees 110
Plant Area 16,000
ft2
Annual Production 5,000,000
units
Production Hrs. Annual 5,200
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $95,414 750,715
kWh
Electricity Demand $43,322 1,584
kW-mo/yr
Electricity Fees $26,227 -
Natural Gas $49,935 5,013
MMBtu
TOTAL YEARLY COSTS $214,898
RECOMMENDED SAVINGS* $20,285 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,614

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.3132: Recharge batteries on during off-peak demand periods $1,207 $661 - $1,207
-
kW-mo/yr
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $9,370 $6,127 $6,879
54,123
kWh
$2,408
-
kW-mo/yr
$467 $(-384.0)
03 2.4226: Use / purchase optimum sized compressor $2,562 $3,136 $2,562
20,155
kWh
- - -
04 2.6231: Utilize controls to operate equipment only when needed $3,447 $8,329 $3,447
27,120
kWh
- - -
05 2.7135: Install occupancy sensors $2,590 $6,532 $2,022
15,912
kWh
$568
-
kW-mo/yr
- -
06 2.3131: Reschedule plant operations or reduce load to avoid peaks $1,109 - $134
4,163
kWh
$975
-
kW-mo/yr
- -
TOTAL RECOMMENDED $20,285 $24,785 $15,044
121,473
kWh
$5,158
-
kW-mo/yr
$467 $(-384.0)
TOTAL IMPLEMENTED $16,614 $21,649 $12,348
97,155
kWh
$4,183
-
kW-mo/yr
$467 $(-384.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs