| Assessment Year | 1982 |
|---|---|
| Principal Product | MOLDED PLASTIC PARTS |
| NAICS |
n/a
|
| SIC | 3089: Plastics Products, Not Elsewhere Classified |
| Sales Range | $1 M to 5M |
| # of Employees | 60 |
| Plant Area |
n/a
|
| Annual Production | 2,000,000
lb
|
| Production Hrs. Annual | 6,312
hrs
|
| Location (State) | Kansas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $107,633 | 1,956,038 |
kWh
|
$0.055 |
| Natural Gas | $4,064 | 1,508 |
MMBtu
|
$2.69 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $50,857 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.6212: Turn off equipment during breaks, reduce operating time | $14,570 | - |
$14,570
264,947
kWh
|
- | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,434 | - |
$2,434
44,256
kWh
|
- | |
| 03 | 2.2511: Insulate bare equipment | $3,756 | $475 |
$3,756
68,288
kWh
|
- | |
| 04 | 2.7494: Install storm windows and doors | $1,984 | $568 | - |
$1,984
-
MMBtu
|
|
| 05 | 2.4324: Replace hydraulic / pneumatic equipment with electric equipment | $28,113 | $40,000 |
$28,113
511,137
kWh
|
- | |
| TOTAL RECOMMENDED | $50,857 | $41,043 |
$48,873
888,628
kWh
|
$1,984
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs