ITAC Assessment: KU0032
ITAC logo
ITAC Assessment: KU0032
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1982
Principal Product MOLDED PLASTIC PARTS
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 60
Plant Area
n/a
Annual Production 2,000,000
lb
Production Hrs. Annual 6,312
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $107,633 1,956,038
kWh
Natural Gas $4,064 1,508
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $50,857 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.6212: Turn off equipment during breaks, reduce operating time $14,570 - $14,570
264,947
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,434 - $2,434
44,256
kWh
-
03 2.2511: Insulate bare equipment $3,756 $475 $3,756
68,288
kWh
-
04 2.7494: Install storm windows and doors $1,984 $568 - $1,984
-
MMBtu
05 2.4324: Replace hydraulic / pneumatic equipment with electric equipment $28,113 $40,000 $28,113
511,137
kWh
-
TOTAL RECOMMENDED $50,857 $41,043 $48,873
888,628
kWh
$1,984
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs