ITAC Assessment: SF0398
ITAC logo
ITAC Assessment: SF0398
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Salty Snack Foods
NAICS 311919: Other Snack Food Manufacturing
SIC 2096: Potato Chips, Corn Chips, and Similar Snacks
Sales Range $100
M
to 500
M
# of Employees 500
Plant Area 333,000
ft2
Annual Production 140,000,000
lb
Production Hrs. Annual 8,712
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,630,928 25,190,905
kWh
Electricity Demand $782,843 44,868
kW-mo/yr
Electricity Fees $37,650 -
Natural Gas $3,699,848 410,252
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $298,220 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $153,771

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Water Disposal Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $7,251 - $7,251
109,374
kWh
- -
02 2.2135: Repair and eliminate steam leaks $4,412 - - $4,412
-
MMBtu
-
03 2.7447: Install vinyl strip / high speed / air curtain doors $23,241 - $23,241
349,632
kWh
- -
04 2.7229: Air condition only space necessary $4,965 $424 $886
13,365
kWh
$4,079
-
MMBtu
-
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $112,927 $56,209 $112,927
1,703,271
kWh
- -
06 2.2425: Use flue gases to heat process or service water $136,531 $212,500 - $136,531
-
MMBtu
-
07 2.6231: Utilize controls to operate equipment only when needed $975 $2,405 $975
14,700
kWh
- -
08 2.4239: Eliminate or reduce compressed air usage $4,046 $25,868 $4,046
61,079
kWh
- -
09 3.4151: Minimize water usage $3,872 $1,867 $255
3,838
kWh
- $3,617
-
Tgal
TOTAL RECOMMENDED $298,220 $299,273 $149,581
2,255,259
kWh
$145,022
-
MMBtu
$3,617
-
Tgal
TOTAL IMPLEMENTED $153,771 $59,038 $145,280
2,190,342
kWh
$8,491
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Water Disposal Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs