ITAC Assessment: SF0364
ITAC logo
ITAC Assessment: SF0364
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Various Food and Baked Goods
NAICS 311999: All Other Miscellaneous Food Manufacturing
SIC 2015: Poultry Slaughtering and Processing
Sales Range $5
M
to 10
M
# of Employees 300
Plant Area 47,056
ft2
Annual Production 1
units
Production Hrs. Annual 8,736
hrs
Location (State) Hawaii

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $614,257 4,091,600
kWh
Electricity Demand $87,301 8,776
kW-mo/yr
Electricity Fees $37,339 -
LPG $11,926 929
MMBtu
Fuel Oil #1 $299,084 14,849
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $231,511 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $193,288

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Fuel Oil #1 Savings One-time Revenue or Avoided Cost Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $2,446 - $1,881
9,386
kWh
$565
-
kW-mo/yr
- -
02 2.7212: Install or upgrade insulation on hvac distribution systems $4,812 $1,046 $4,812
24,007
kWh
- - -
03 2.4133: Use most efficient type of electric motors $1,974 $913 $1,712
8,540
kWh
$262
-
kW-mo/yr
- -
04 2.6231: Utilize controls to operate equipment only when needed $1,655 $798 $1,655
8,257
kWh
- - -
05 2.7135: Install occupancy sensors $4,350 $2,680 $4,350
21,705
kWh
- - -
06 2.1331: Burn a less expensive grade of fuel $85,730 $61,250 - - - $85,730
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $13,557 $10,440 $13,557
67,637
kWh
- - -
08 2.2414: Use waste heat from hot flue gases to preheat $20,316 $22,812 - - $20,316
-
MMBtu
-
09 2.7212: Install or upgrade insulation on hvac distribution systems $9,060 $11,740 $9,060
45,201
kWh
- - -
10 2.1241: Reduce excessive boiler blowdown $6,734 $8,900 - - $6,734
-
MMBtu
-
11 2.7142: Utilize higher efficiency lamps and/or ballasts $409 $801 $373
19,020
kWh
$36
-
kW-mo/yr
- -
12 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,909 $2,854 $1,739
8,678
kWh
$170
-
kW-mo/yr
- -
13 2.4239: Eliminate or reduce compressed air usage $2,296 $2,489 $1,601
7,987
kWh
$695
-
kW-mo/yr
- -
14 2.1311: Replace electrically-operated equipment with fossil fuel equipment $63,306 $125,074 $48,931
244,119
kWh
$14,375
-
kW-mo/yr
- -
15 2.4226: Use / purchase optimum sized compressor $6,376 $28,462 $6,376
31,810
kWh
- - -
16 2.7232: Replace existing hvac unit with high efficiency model $6,581 $35,138 $4,844
24,167
kWh
$1,737
-
kW-mo/yr
- -
TOTAL RECOMMENDED $231,511 $315,397 $100,891
520,514
kWh
$17,840
-
kW-mo/yr
$27,050
-
MMBtu
$85,730
TOTAL IMPLEMENTED $193,288 $279,465 $82,984
431,172
kWh
$17,840
-
kW-mo/yr
$6,734
-
MMBtu
$85,730
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Fuel Oil #1 Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs