Assessment Year | 1993 |
---|---|
Principal Product | Aircraft Products, NEC |
NAICS |
n/a
|
SIC | 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified |
Sales Range | $1 M to 5M |
# of Employees | 33 |
Plant Area |
18,750
ft2
|
Annual Production | 7,600
pieces
|
Production Hrs. Annual | 4,250
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $62,347 | 1,020,809 |
kWh
|
$0.061 |
LPG | $14,846 | 3,345 |
MMBtu
|
$4.44 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $32,387 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $4,950 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | LPG Savings |
---|---|---|---|---|---|---|
01 | 2.1223: Install smaller boiler (increase high fire duty cycle) | $27,437 | $28,187 |
$24,462
400,645
kWh
|
$2,975
-
MMBtu
|
|
02 | 2.1221: Replace obsolete burners with more efficient ones | $1,147 | $1,375 |
$1,147
24,326
kWh
|
- | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,050 | $30 |
$1,050
17,292
kWh
|
- | |
04 | 2.4314: Use synthetic lubricant | $341 | $144 |
$341
5,569
kWh
|
- | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $886 | $2,324 |
$886
14,361
kWh
|
- | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $463 | $145 |
$463
7,620
kWh
|
- | |
07 | 2.4133: Use most efficient type of electric motors | $771 | $1,919 |
$771
12,603
kWh
|
- | |
08 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $292 | $100 |
$292
4,689
kWh
|
- | |
TOTAL RECOMMENDED | $32,387 | $34,224 |
$29,412
487,105
kWh
|
$2,975
-
MMBtu
|
||
TOTAL IMPLEMENTED | $4,950 | $6,037 |
$4,950
86,460
kWh
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | LPG Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs