ITAC Assessment: SF0344
ITAC logo
ITAC Assessment: SF0344
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Wine
NAICS 312130: Wineries
SIC 2084: Wines, Brandy, and Brandy Spirits
Sales Range $10
M
to 50
M
# of Employees 34
Plant Area 73,000
ft2
Annual Production 100,000
units
Production Hrs. Annual 1,445
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $76,959 660,200
kWh
Electricity Demand $22,212 2,403
kW-mo/yr
Electricity Fees $1,915 -
LPG $33,500 1,979
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $30,453 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $9,612 $3,008 $9,612
83,791
kWh
-
02 2.4133: Use most efficient type of electric motors $335 $352 $211
1,845
kWh
$124
-
kW-mo/yr
03 2.7442: Keep doors and windows shut when not on use $13,469 $7,210 $10,225
89,135
kWh
$3,244
-
kW-mo/yr
04 2.4231: Reduce the pressure of compressed air to the minimum required $2,078 $4,880 $1,556
13,565
kWh
$522
-
kW-mo/yr
05 2.4224: Upgrade controls on compressors $2,664 $8,663 - $2,664
-
kW-mo/yr
06 2.7142: Utilize higher efficiency lamps and/or ballasts $2,295 $15,730 $1,668
14,537
kWh
$627
-
kW-mo/yr
TOTAL RECOMMENDED $30,453 $39,843 $23,272
202,873
kWh
$7,181
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs