Assessment Year | 2005 |
---|---|
Principal Product | Decorative Packaging for the Floral Industry |
NAICS | 339999: All Other Miscellaneous Manufacturing |
SIC | 3999: Manufacturing Industries, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 100 |
Plant Area |
51,000
ft2
|
Annual Production | 100,000
pieces
|
Production Hrs. Annual | 7,488
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $44,304 | 991,040 |
kWh
|
$0.045 |
Electricity Demand | $20,387 | 3,200 |
kW-mo/yr
|
$6.37 |
Natural Gas | $74,087 | 11,490 |
MMBtu
|
$6.45 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $49,447 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.7231: Use radiant heater for spot heating | $14,504 | $9,200 | - | - |
$14,504
-
MMBtu
|
|
02 | 2.2442: Preheat combustion air with waste heat | $7,913 | $12,000 | - | - |
$7,913
-
MMBtu
|
|
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,962 | $3,545 |
$6,030
90,135
kWh
|
$932
-
kW-mo/yr
|
- | |
04 | 2.2531: Re-size charging openings or add movable cover or door | $6,896 | $15,000 | - | - |
$6,896
-
MMBtu
|
|
05 | 2.2442: Preheat combustion air with waste heat | $6,787 | $5,000 | - | - |
$6,787
-
MMBtu
|
|
06 | 2.1233: Analyze flue gas for proper air/fuel ratio | $2,439 | $3,200 | - | - |
$2,439
-
MMBtu
|
|
07 | 2.7135: Install occupancy sensors | $1,696 | $375 |
$1,454
21,729
kWh
|
$242
-
kW-mo/yr
|
- | |
08 | 2.1233: Analyze flue gas for proper air/fuel ratio | $1,494 | $3,200 | - | - |
$1,494
-
MMBtu
|
|
09 | 2.4231: Reduce the pressure of compressed air to the minimum required | $544 | - |
$437
10,514
kWh
|
$107
-
kW-mo/yr
|
- | |
10 | 2.4234: Cool compressor air intake with heat exchanger | $212 | $450 |
$171
4,117
kWh
|
$41
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $49,447 | $51,970 |
$8,092
126,495
kWh
|
$1,322
-
kW-mo/yr
|
$40,033
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs