Assessment Year | 2003 |
---|---|
Principal Product | Corrugated Board |
NAICS | 322211: Corrugated and Solid Fiber Box Manufacturing |
SIC | 2653: Corrugated and Solid Fiber Boxes |
Sales Range | $10 M to 50M |
# of Employees | 144 |
Plant Area |
261,360
ft2
|
Annual Production | 0
units
|
Production Hrs. Annual | 6,576
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $556,944 | 4,966,970 |
kWh
|
$0.11 |
Natural Gas | $237,316 | 60,141 |
MMBtu
|
$3.95 |
LPG | $22,622 | 3,245 |
MMBtu
|
$6.97 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $61,253 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $39,396 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.6231: Utilize controls to operate equipment only when needed | $12,122 | $353 |
$12,122
112,344
kWh
|
- | - | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $11,000 | - |
$11,300
104,724
kWh
|
- | - | $(-300.0) | |
03 | 2.4224: Upgrade controls on compressors | $6,191 | $95 |
$6,191
57,375
kWh
|
- | - | - | |
04 | 2.7135: Install occupancy sensors | $3,193 | $1,110 |
$3,193
29,592
kWh
|
- | - | - | |
05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $356 | $206 |
$356
3,300
kWh
|
- | - | - | |
06 | 2.4133: Use most efficient type of electric motors | $1,655 | $767 |
$1,655
15,333
kWh
|
- | - | - | |
07 | 2.2511: Insulate bare equipment | $7,560 | $5,632 | - |
$7,560
-
MMBtu
|
- | - | |
08 | 2.4239: Eliminate or reduce compressed air usage | $3,200 | $4,171 |
$3,200
29,662
kWh
|
- | - | - | |
09 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $4,339 | $7,671 |
$5,243
56,972
kWh
|
$(-904.0)
-
MMBtu
|
- | - | |
10 | 2.4226: Use / purchase optimum sized compressor | $2,157 | $4,220 |
$2,157
24,529
kWh
|
- | - | - | |
11 | 2.2122: Install / repair insulation on condensate lines | $801 | $2,034 | - |
$801
-
MMBtu
|
- | - | |
12 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,078 | $12,357 |
$3,078
28,522
kWh
|
- | - | - | |
13 | 2.3212: Optimize plant power factor | $5,601 | $8,218 | - | - | $5,601 | - | |
TOTAL RECOMMENDED | $61,253 | $46,834 |
$48,495
462,353
kWh
|
$7,457
-
MMBtu
|
$5,601 | $(-300.0) | ||
TOTAL IMPLEMENTED | $39,396 | $18,902 |
$39,696
372,419
kWh
|
- | - | $(-300.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs