ITAC Assessment: SD0653
ITAC logo
ITAC Assessment: SD0653
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Plastic Products
NAICS 326121: Unlaminated Plastics Profile Shape Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 48
Plant Area 28,000
ft2
Annual Production 5,000,000
units
Production Hrs. Annual 6,120
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $121,261 895,383
kWh
Electricity Demand $101,494 2,820
kW-mo/yr
Electricity Fees $6,533 -
Natural Gas $3,547 121
MMBtu
TOTAL YEARLY COSTS $232,835
RECOMMENDED SAVINGS* $333,187 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Primary Product Savings
01 2.9114: Use solar heat to make electricty $121,184 $170,933 $58,489
431,970
kWh
$62,695
-
kW-mo/yr
-
02 2.3141: Use battery storage for demand control $91,923 - $(-7,373.0)
(-54,450)
kWh
$99,296
-
kW-mo/yr
-
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,208 $1,590 $2,337
17,258
kWh
$871
-
kW-mo/yr
-
04 2.4223: Install direct acting units in place of compressed air pressure system in safety system $3,133 $8,720 $3,133
23,140
kWh
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,223 $1,822 $802
5,924
kWh
$407
-
kW-mo/yr
$14
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $995 $2,202 $570
4,209
kWh
$425
-
kW-mo/yr
-
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,867 $3,608 $3,362
24,832
kWh
$2,505
-
kW-mo/yr
-
08 2.4231: Reduce the pressure of compressed air to the minimum required $751 $500 $751
5,544
kWh
- -
09 2.4133: Use most efficient type of electric motors $15,105 $27,075 $7,396
54,620
kWh
$7,709
-
kW-mo/yr
-
10 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $38,544 $64,866 $18,872
139,380
kWh
$19,672
-
kW-mo/yr
-
11 2.1121: Use insulation in furnaces to facilitate heating / cooling $275 $157 $135
993
kWh
$140
-
kW-mo/yr
-
12 2.6231: Utilize controls to operate equipment only when needed $50,979 $44,800 $35,978
265,713
kWh
$15,001
-
kW-mo/yr
-
TOTAL RECOMMENDED $333,187 $326,273 $124,452
919,133
kWh
$208,721
-
kW-mo/yr
$14
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs