Assessment Year | 2024 |
---|---|
Principal Product | Plastic Products |
NAICS | 326121: Unlaminated Plastics Profile Shape Manufacturing |
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $5 M to 10M |
# of Employees | 48 |
Plant Area |
28,000
ft2
|
Annual Production | 5,000,000
units
|
Production Hrs. Annual | 6,120
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $121,261 | 895,383 |
kWh
|
$0.14 |
Electricity Demand | $101,494 | 2,820 |
kW-mo/yr
|
$35.99 |
Electricity Fees | $6,533 | - |
|
- |
Natural Gas | $3,547 | 121 |
MMBtu
|
$29.34 |
TOTAL YEARLY COSTS | $232,835 | |||
RECOMMENDED SAVINGS* | $333,187 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Primary Product Savings |
---|---|---|---|---|---|---|---|
01 | 2.9114: Use solar heat to make electricty | $121,184 | $170,933 |
$58,489
431,970
kWh
|
$62,695
-
kW-mo/yr
|
- | |
02 | 2.3141: Use battery storage for demand control | $91,923 | - |
$(-7,373.0)
(-54,450)
kWh
|
$99,296
-
kW-mo/yr
|
- | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $3,208 | $1,590 |
$2,337
17,258
kWh
|
$871
-
kW-mo/yr
|
- | |
04 | 2.4223: Install direct acting units in place of compressed air pressure system in safety system | $3,133 | $8,720 |
$3,133
23,140
kWh
|
- | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,223 | $1,822 |
$802
5,924
kWh
|
$407
-
kW-mo/yr
|
$14 | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $995 | $2,202 |
$570
4,209
kWh
|
$425
-
kW-mo/yr
|
- | |
07 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $5,867 | $3,608 |
$3,362
24,832
kWh
|
$2,505
-
kW-mo/yr
|
- | |
08 | 2.4231: Reduce the pressure of compressed air to the minimum required | $751 | $500 |
$751
5,544
kWh
|
- | - | |
09 | 2.4133: Use most efficient type of electric motors | $15,105 | $27,075 |
$7,396
54,620
kWh
|
$7,709
-
kW-mo/yr
|
- | |
10 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $38,544 | $64,866 |
$18,872
139,380
kWh
|
$19,672
-
kW-mo/yr
|
- | |
11 | 2.1121: Use insulation in furnaces to facilitate heating / cooling | $275 | $157 |
$135
993
kWh
|
$140
-
kW-mo/yr
|
- | |
12 | 2.6231: Utilize controls to operate equipment only when needed | $50,979 | $44,800 |
$35,978
265,713
kWh
|
$15,001
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $333,187 | $326,273 |
$124,452
919,133
kWh
|
$208,721
-
kW-mo/yr
|
$14 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Primary Product Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs