Assessment Year | 2024 |
---|---|
Principal Product | Turbine Stators and Aircraft Parts |
NAICS | 336413: Other Aircraft Parts and Auxiliary Equipment Manufacturing |
SIC | 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified |
Sales Range | $50 M to 100M |
# of Employees | 280 |
Plant Area |
120,000
ft2
|
Annual Production | 15,000
units
|
Production Hrs. Annual | 6,900
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,976,397 | 6,187,528 |
kWh
|
$0.32 |
Electricity Demand | $909,283 | 12,373 |
kW-mo/yr
|
$73.49 |
Electricity Fees | $(-857,647.0) | - |
|
- |
TOTAL YEARLY COSTS | $2,028,033 | |||
RECOMMENDED SAVINGS* | $2,835,679 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $238,784 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $22,994 | $4,000 |
$22,994
71,990
kWh
|
- | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $7,906 | $4,828 |
$5,977
18,713
kWh
|
$1,929
-
kW-mo/yr
|
|
03 | 2.4223: Install direct acting units in place of compressed air pressure system in safety system | $15,800 | $12,200 |
$15,800
49,469
kWh
|
- | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $113,272 | $30,051 |
$85,296
267,050
kWh
|
$27,976
-
kW-mo/yr
|
|
05 | 2.9114: Use solar heat to make electricty | $824,443 | $529,751 |
$427,597
1,338,750
kWh
|
$396,846
-
kW-mo/yr
|
|
06 | 2.3141: Use battery storage for demand control | $409,025 | - |
$(-53,889.0)
(-168,718)
kWh
|
$462,914
-
kW-mo/yr
|
|
07 | 2.7261: Install timers and/or thermostats | $35,974 | $2,600 |
$24,816
77,697
kWh
|
$11,158
-
kW-mo/yr
|
|
08 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $14,384 | $2,234 |
$10,831
33,911
kWh
|
$3,553
-
kW-mo/yr
|
|
09 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $364,878 | $49,250 | - |
$364,878
-
kW-mo/yr
|
|
10 | 2.7491: Insulate glazing, walls, ceilings, and roofs | $2,121 | $10,016 |
$1,305
4,085
kWh
|
$816
-
kW-mo/yr
|
|
11 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $41,340 | $15,608 |
$31,130
97,463
kWh
|
$10,210
-
kW-mo/yr
|
|
12 | 2.7233: Use properly designed and sized hvac equipment | $982,749 | $783,575 |
$743,098
2,326,544
kWh
|
$239,651
-
kW-mo/yr
|
|
13 | 2.1121: Use insulation in furnaces to facilitate heating / cooling | $793 | $1,336 |
$595
1,863
kWh
|
$198
-
kW-mo/yr
|
|
TOTAL RECOMMENDED | $2,835,679 | $1,445,449 |
$1,315,550
4,118,817
kWh
|
$1,520,129
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | $238,784 | $70,673 |
$182,944
572,772
kWh
|
$55,840
-
kW-mo/yr
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs