ITAC Assessment: SD0648
ITAC logo
ITAC Assessment: SD0648
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Turbine Stators and Aircraft Parts
NAICS 336413: Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 280
Plant Area 120,000
ft2
Annual Production 15,000
units
Production Hrs. Annual 6,900
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,976,397 6,187,528
kWh
Electricity Demand $909,283 12,373
kW-mo/yr
Electricity Fees $(-857,647.0) -
TOTAL YEARLY COSTS $2,028,033
RECOMMENDED SAVINGS* $2,835,679 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $238,784

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $22,994 $4,000 $22,994
71,990
kWh
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $7,906 $4,828 $5,977
18,713
kWh
$1,929
-
kW-mo/yr
03 2.4223: Install direct acting units in place of compressed air pressure system in safety system $15,800 $12,200 $15,800
49,469
kWh
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $113,272 $30,051 $85,296
267,050
kWh
$27,976
-
kW-mo/yr
05 2.9114: Use solar heat to make electricty $824,443 $529,751 $427,597
1,338,750
kWh
$396,846
-
kW-mo/yr
06 2.3141: Use battery storage for demand control $409,025 - $(-53,889.0)
(-168,718)
kWh
$462,914
-
kW-mo/yr
07 2.7261: Install timers and/or thermostats $35,974 $2,600 $24,816
77,697
kWh
$11,158
-
kW-mo/yr
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $14,384 $2,234 $10,831
33,911
kWh
$3,553
-
kW-mo/yr
09 2.3131: Reschedule plant operations or reduce load to avoid peaks $364,878 $49,250 - $364,878
-
kW-mo/yr
10 2.7491: Insulate glazing, walls, ceilings, and roofs $2,121 $10,016 $1,305
4,085
kWh
$816
-
kW-mo/yr
11 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $41,340 $15,608 $31,130
97,463
kWh
$10,210
-
kW-mo/yr
12 2.7233: Use properly designed and sized hvac equipment $982,749 $783,575 $743,098
2,326,544
kWh
$239,651
-
kW-mo/yr
13 2.1121: Use insulation in furnaces to facilitate heating / cooling $793 $1,336 $595
1,863
kWh
$198
-
kW-mo/yr
TOTAL RECOMMENDED $2,835,679 $1,445,449 $1,315,550
4,118,817
kWh
$1,520,129
-
kW-mo/yr
TOTAL IMPLEMENTED $238,784 $70,673 $182,944
572,772
kWh
$55,840
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs