Assessment Year | 2024 |
---|---|
Principal Product | Sheet Metal Fabrication |
NAICS | 332322: Sheet Metal Work Manufacturing |
SIC | 3444: Sheet Metal Work |
Sales Range | $10 M to 50M |
# of Employees | 105 |
Plant Area |
73,000
ft2
|
Annual Production | 300
units
|
Production Hrs. Annual | 2,000
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $102,899 | 898,040 |
kWh
|
$0.11 | |
Electricity Demand | $52,472 | 3,734 |
kW-mo/yr
|
$14.05 | |
Electricity Fees | $37,721 | - |
|
- | |
Natural Gas | $56,912 | 3,224 |
MMBtu
|
$17.65 | |
Waste Disposal Costs | |||||
Other Liquid (haz) | $42,996 | 21,716,952 |
gal
|
$0.002 | |
TOTAL YEARLY COSTS | $293,000 | ||||
RECOMMENDED SAVINGS* | $174,761 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $158,670 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (haz) Savings | Personnel Changes Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.7261: Install timers and/or thermostats | $678 | $180 |
$201
1,753
kWh
|
$477
-
kW-mo/yr
|
- | - | - | - | |
02 | 2.1133: Adjust burners for efficient operation | $16,626 | $6,076 | - | - |
$16,626
-
MMBtu
|
- | - | - | |
03 | 2.1121: Use insulation in furnaces to facilitate heating / cooling | $503 | $614 | - | - |
$503
-
MMBtu
|
- | - | - | |
04 | 2.9114: Use solar heat to make electricty | $81,600 | $250,043 |
$61,368
535,500
kWh
|
$20,232
-
kW-mo/yr
|
- | - | - | - | |
05 | 2.3141: Use battery storage for demand control | $8,600 | - |
$(-1,516.0)
(-13,227)
kWh
|
$10,116
-
kW-mo/yr
|
- | - | - | - | |
06 | 4.212: Adopt in-house material generation | $32,881 | $97,356 |
$(-14,016.0)
(-122,304)
kWh
|
- | - |
$34,782
-
gal
|
- | $12,115 | |
07 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $898 | $3,115 |
$898
7,833
kWh
|
- | - | - | - | - | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,221 | $10,759 |
$2,029
17,703
kWh
|
$1,137
-
kW-mo/yr
|
- | - | $55 | - | |
09 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $276 | $932 |
$159
1,391
kWh
|
$117
-
kW-mo/yr
|
- | - | - | - | |
10 | 2.4223: Install direct acting units in place of compressed air pressure system in safety system | $4,515 | $6,200 |
$4,515
39,400
kWh
|
- | - | - | - | - | |
11 | 2.4231: Reduce the pressure of compressed air to the minimum required | $516 | $250 |
$516
4,505
kWh
|
- | - | - | - | - | |
12 | 2.4231: Reduce the pressure of compressed air to the minimum required | $9,254 | $250 |
$9,254
80,746
kWh
|
- | - | - | - | - | |
13 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $5,672 | $3,061 |
$4,855
42,361
kWh
|
$818
-
kW-mo/yr
|
- | - | - | - | |
14 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $4,188 | $6,972 |
$4,168
36,368
kWh
|
$20
-
kW-mo/yr
|
- | - | - | - | |
15 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $5,333 | $13,388 |
$5,333
46,533
kWh
|
- | - | - | - | - | |
TOTAL RECOMMENDED | $174,761 | $399,196 |
$77,764
678,562
kWh
|
$32,917
-
kW-mo/yr
|
$17,129
-
MMBtu
|
$34,782
-
gal
|
$55 | $12,115 | ||
TOTAL IMPLEMENTED | $158,670 | $372,660 |
$62,510
545,467
kWh
|
$32,079
-
kW-mo/yr
|
$17,129
-
MMBtu
|
$34,782
-
gal
|
$55 | $12,115 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (haz) Savings | Personnel Changes Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs