| Assessment Year | 2004 |
|---|---|
| Principal Product | shock and vibration measuring equipment |
| NAICS | 334519: Other Measuring and Controlling Device Manufacturing |
| SIC | 3829: Measuring and Controlling Devices, Not Elsewhere Classified |
| Sales Range | $50 M to 100M |
| # of Employees | 400 |
| Plant Area |
125,000
ft2
|
| Annual Production | 0
pieces
|
| Production Hrs. Annual | 3,713
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $371,621 | 3,978,014 |
kWh
|
$0.093 |
| Electricity Demand | $156,738 | 10,765 |
kW-mo/yr
|
$14.56 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $35,282 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $9,352 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Other Liquid (haz) Savings | Solid Waste (non-haz) Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.6231: Utilize controls to operate equipment only when needed | $8,531 | $1,040 |
$8,531
91,335
kWh
|
- | - | - | |
| 02 | 2.6218: Turn off equipment when not in use | $7,397 | - |
$7,397
79,200
kWh
|
- | - | - | |
| 03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,058 | - |
$1,058
11,324
kWh
|
- | - | - | |
| 04 | 2.4221: Install compressor air intakes in coolest locations | $586 | $648 |
$295
3,155
kWh
|
$291
-
kW-mo/yr
|
- | - | |
| 05 | 2.7135: Install occupancy sensors | $897 | $700 |
$897
9,600
kWh
|
- | - | - | |
| 06 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $15,253 | $18,500 | - | - | - |
$15,253
-
lb
|
|
| 07 | 3.3131: Use evaporation to concentrate material | $1,560 | $1,300 | - | - |
$1,560
-
gal
|
- | |
| TOTAL RECOMMENDED | $35,282 | $22,188 |
$18,178
194,614
kWh
|
$291
-
kW-mo/yr
|
$1,560
-
gal
|
$15,253
-
lb
|
||
| TOTAL IMPLEMENTED | $9,352 | $700 |
$9,352
100,124
kWh
|
- | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Other Liquid (haz) Savings | Solid Waste (non-haz) Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs