Assessment Year | 2003 |
---|---|
Principal Product | Steel pipes |
NAICS | 332312: Fabricated Structural Metal Manufacturing |
SIC | 3443: Fabricated Plate Work (Boiler Shops) |
Sales Range | $1 M to 5M |
# of Employees | 35 |
Plant Area |
3,092,760
ft2
|
Annual Production | 700
ton
|
Production Hrs. Annual | 2,338
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $160,951 | 1,438,111 |
kWh
|
$0.11 |
Electricity Demand | $50,262 | 3,600 |
kW-mo/yr
|
$13.96 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $130,354 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $35,397 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4226: Use / purchase optimum sized compressor | $44,623 | - |
$26,354
235,089
kWh
|
$18,269
-
kW-mo/yr
|
- | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $35,397 | $4,000 |
$35,397
315,759
kWh
|
- | - | |
03 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $15,861 | $20,000 |
$9,173
81,830
kWh
|
$8,550
-
kW-mo/yr
|
$(-1,862.0)
-
MMBtu
|
|
04 | 2.4324: Replace hydraulic / pneumatic equipment with electric equipment | $14,893 | $7,700 |
$14,893
148,928
kWh
|
- | - | |
05 | 2.7111: Reduce illumination to minimum necessary levels | $7,795 | $384 |
$4,717
42,075
kWh
|
$3,078
-
kW-mo/yr
|
- | |
06 | 2.4226: Use / purchase optimum sized compressor | $4,905 | $7,000 |
$2,896
25,836
kWh
|
$2,009
-
kW-mo/yr
|
- | |
07 | 2.7134: Use photocell controls | $4,846 | $6,000 |
$2,594
23,140
kWh
|
$2,252
-
kW-mo/yr
|
- | |
08 | 2.7261: Install timers and/or thermostats | $2,034 | $500 |
$2,034
18,144
kWh
|
- | - | |
TOTAL RECOMMENDED | $130,354 | $45,584 |
$98,058
890,801
kWh
|
$34,158
-
kW-mo/yr
|
$(-1,862.0)
-
MMBtu
|
||
TOTAL IMPLEMENTED | $35,397 | $4,000 |
$35,397
315,759
kWh
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs