ITAC Assessment: UD1068
ITAC logo
ITAC Assessment: UD1068
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Metal Fabrication
NAICS 332322: Sheet Metal Work Manufacturing
SIC 3444: Sheet Metal Work
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area 80,000
ft2
Annual Production 906,884
units
Production Hrs. Annual 6,864
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $103,869 1,375,200
kWh
Electricity Demand $47,638 4,589
kW-mo/yr
Electricity Fees $15,858 -
Natural Gas $9,205 986
MMBtu
Waste Disposal Costs
Water Usage $1,414 233
Tgal
Water Disposal $1,299 233
Tgal
Other Liquid (non-haz) $5,802 1
gal
TOTAL YEARLY COSTS $185,085
RECOMMENDED SAVINGS* $14,708 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,629

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.4313: Provide proper maintenance of motor driven equipment $529 - $529
7,004
kWh
- - -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $425 - $256
3,388
kWh
$169
-
kW-mo/yr
- -
03 2.4231: Reduce the pressure of compressed air to the minimum required $3,164 - $2,663
35,264
kWh
$501
-
kW-mo/yr
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,629 $100 $1,371
18,153
kWh
$258
-
kW-mo/yr
- -
05 2.4239: Eliminate or reduce compressed air usage $1,431 $994 $1,431
18,951
kWh
- - -
06 2.7135: Install occupancy sensors $7,530 $4,236 $6,567
86,981
kWh
- $178 $785
TOTAL RECOMMENDED $14,708 $5,330 $12,817
169,741
kWh
$928
-
kW-mo/yr
$178 $785
TOTAL IMPLEMENTED $1,629 $100 $1,371
18,153
kWh
$258
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs