| Assessment Year | 1985 |
|---|---|
| Principal Product | COLD ROLLED METAL PARTS |
| NAICS |
n/a
|
| SIC | 3316: Cold-Rolled Steel Sheet, Strip, and Bars |
| Sales Range | $5 M to 10M |
| # of Employees | 88 |
| Plant Area |
n/a
|
| Annual Production | 2,700,000
ton
|
| Production Hrs. Annual | 6,425
hrs
|
| Location (State) | Massachusetts |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $213,290 | 2,866,940 |
kWh
|
$0.074 |
| LPG | $59,509 | 7,557 |
MMBtu
|
$7.87 |
| Fuel Oil #2 | $61,202 | 9,394 |
MMBtu
|
$6.52 |
| Fuel Oil #6 | $83,698 | 15,580 |
MMBtu
|
$5.37 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $20,688 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $11,768 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | LPG Savings | Fuel Oil #6 Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,941 | $10,097 |
$5,941
80,305
kWh
|
- | - | |
| 02 | 2.7245: Use direct air supply to exhaust hoods | $3,248 | $1,230 |
$(-120.0)
(-1,758)
kWh
|
$3,368
-
MMBtu
|
- | |
| 03 | 2.2532: Use only amount of air necessary to prevent explosion hazard | $8,920 | $611 | - | - |
$8,920
-
MMBtu
|
|
| 04 | 2.7226: Use computer programs to optimize hvac performance | $2,341 | $6,800 |
$2,341
31,653
kWh
|
- | - | |
| 05 | 2.4221: Install compressor air intakes in coolest locations | $238 | $100 |
$238
3,224
kWh
|
- | - | |
| TOTAL RECOMMENDED | $20,688 | $18,838 |
$8,400
113,424
kWh
|
$3,368
-
MMBtu
|
$8,920
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $11,768 | $18,227 |
$8,400
113,424
kWh
|
$3,368
-
MMBtu
|
- | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs