ITAC Assessment: MZ0043
ITAC logo
ITAC Assessment: MZ0043
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2009
Principal Product large plastic pipe
NAICS 326122: Plastics Pipe and Pipe Fitting Manufacturing
SIC 3084: Plastics Pipe
Sales Range $10
M
to 50
M
# of Employees 46
Plant Area 77,600
ft2
Annual Production 6,000,000
lb
Production Hrs. Annual 8,400
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $937,875 13,277,112
kWh
Natural Gas $51,420 23,750
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $226,578 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $223,569

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $4,595 $20,400 $1,085
15,375
kWh
$3,510
-
kW-mo/yr
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,634 $860 $1,314
14,061
kWh
$320
-
kW-mo/yr
-
03 2.7135: Install occupancy sensors $2,319 $480 $1,782
17,640
kWh
$537
-
kW-mo/yr
-
04 2.7492: Use proper thickness of insulation on building envelope $627 $1,800 - - $627
-
MMBtu
05 2.7492: Use proper thickness of insulation on building envelope $7,387 $3,600 $7,387
104,639
kWh
- -
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,995 $1 $3,995
51,660
kWh
- -
07 2.2437: Recover waste heat from equipment $3,009 $500 - - $3,009
-
MMBtu
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $192,075 $12,080 $192,075
2,747,514
kWh
- -
09 2.1211: Move boiler to more efficient location $10,937 $3,000 - - $10,937
-
MMBtu
TOTAL RECOMMENDED $226,578 $42,721 $207,638
2,950,889
kWh
$4,367
-
kW-mo/yr
$14,573
-
MMBtu
TOTAL IMPLEMENTED $223,569 $42,221 $207,638
2,950,889
kWh
$4,367
-
kW-mo/yr
$11,564
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs