ITAC Assessment: AR0042
ITAC logo
ITAC Assessment: AR0042
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Diary Feed
NAICS
n/a
SIC 2048: Prepared Feed and Feed Ingredients for Animals and Fowls, Except Dogs and Cats
Sales Range $5
M
to 10
M
# of Employees 7
Plant Area 12,000
ft2
Annual Production 45,000
ton
Production Hrs. Annual 5,214
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $62,353 1,162,075
kWh
Natural Gas $28,414 6,395
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $12,588 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,431

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $178 $142 $178
3,224
kWh
-
02 2.4133: Use most efficient type of electric motors $3,179 $5,940 $3,179
59,203
kWh
-
03 2.4221: Install compressor air intakes in coolest locations $74 $100 $74
1,465
kWh
-
04 2.1223: Install smaller boiler (increase high fire duty cycle) $9,141 $2,000 - $9,141
-
MMBtu
05 2.3136: Overlap custodial services with normal day hours $16 $50 - $16
-
MMBtu
TOTAL RECOMMENDED $12,588 $8,232 $3,431
63,892
kWh
$9,157
-
MMBtu
TOTAL IMPLEMENTED $3,431 $6,182 $3,431
63,892
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs