| Assessment Year | 1989 |
|---|---|
| Principal Product | ARCHITECTURAL GLASS |
| NAICS |
n/a
|
| SIC | 3231: Glass Products, Made of Purchased Glass |
| Sales Range | $10 M to 50M |
| # of Employees | 150 |
| Plant Area |
n/a
|
| Annual Production | 0
units
|
| Production Hrs. Annual | 5,000
hrs
|
| Location (State) | Oklahoma |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $238,083 | 8,909,144 |
kWh
|
$0.027 |
| Natural Gas | $18,705 | 5,720 |
MMBtu
|
$3.27 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $63,106 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $58,547 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.2449: Recover heat from exhausted steam, hot air or hot water | $48,600 | $7,500 |
$48,600
1,827,081
kWh
|
- | - | |
| 02 | 2.4312: Improve lubrication practices | $4,666 | - |
$4,666
93,494
kWh
|
- | - | |
| 03 | 2.4133: Use most efficient type of electric motors | $423 | $510 |
$423
8,499
kWh
|
- | - | |
| 04 | 2.7221: Lower temperature during the winter season and vice-versa | $3,413 | - | - |
$3,413
-
MMBtu
|
- | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $319 | $504 |
$319
5,275
kWh
|
- | - | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $217 | $465 |
$217
3,810
kWh
|
- | - | |
| 07 | 2.4221: Install compressor air intakes in coolest locations | $1,445 | $629 |
$1,445
54,220
kWh
|
- | - | |
| 08 | 2.7111: Reduce illumination to minimum necessary levels | $393 | $1,086 |
$232
6,741
kWh
|
- | $161 | |
| 09 | 2.7231: Use radiant heater for spot heating | $3,630 | $21,600 | - |
$3,630
-
MMBtu
|
- | |
| TOTAL RECOMMENDED | $63,106 | $32,294 |
$55,902
1,999,120
kWh
|
$7,043
-
MMBtu
|
$161 | ||
| TOTAL IMPLEMENTED | $58,547 | $8,639 |
$55,134
1,983,294
kWh
|
$3,413
-
MMBtu
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs