Assessment Year | 2019 |
---|---|
Principal Product | Metal Filter Cleaning |
NAICS | 332999: All Other Miscellaneous Fabricated Metal Product Manufacturing |
SIC | 3499: Fabricated Metal Products, Not Elsewhere Classified |
Sales Range | $5 M to 10M |
# of Employees | 42 |
Plant Area |
50,000
ft2
|
Annual Production | 350,000
units
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Alabama |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $129,120 | 1,802,340 |
kWh
|
$0.072 |
Electricity Fees | $7,478 | - |
|
- |
Natural Gas | $265,645 | 31,650 |
MMBtu
|
$8.39 |
TOTAL YEARLY COSTS | $402,243 | |||
RECOMMENDED SAVINGS* | $94,631 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $8,609 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Fees Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $16,997 | $12,406 |
$16,068
224,272
kWh
|
$929 | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,544 | $1,372 |
$1,460
20,380
kWh
|
$84 | - | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,768 | $500 |
$2,617
36,532
kWh
|
$151 | - | |
04 | 2.2427: Use waste heat from hot flue gases to preheat incoming fluids | $66,257 | $100,000 | - | - |
$66,257
-
MMBtu
|
|
05 | 2.2511: Insulate bare equipment | $7,065 | $8,101 |
$5,069
70,755
kWh
|
$293 |
$1,703
-
MMBtu
|
|
TOTAL RECOMMENDED | $94,631 | $122,379 |
$25,214
351,939
kWh
|
$1,457 |
$67,960
-
MMBtu
|
||
TOTAL IMPLEMENTED | $8,609 | $9,473 |
$6,529
91,135
kWh
|
$377 |
$1,703
-
MMBtu
|
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs