ITAC Assessment: SD0205
ITAC logo
ITAC Assessment: SD0205
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Reverse osmosis membranes
NAICS
n/a
SIC 3559: Special Industry Machinery, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 160
Plant Area 156,000
ft2
Annual Production 60,000
pieces
Production Hrs. Annual 4,676
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $170,283 3,458,089
kWh
Electricity Demand $174,776 10,924
kW-mo/yr
Natural Gas $27,030 4,334
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $591,743 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $181,955

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (non-haz) Savings Solid Waste (haz) Savings Administrative Changes Savings
01 2.2614: Use cooling tower or economizer to replace chiller cooling $11,008 $12,000 $6,797
138,628
kWh
$4,211
-
kW-mo/yr
- - - -
02 2.7261: Install timers and/or thermostats $1,896 $1,029 $1,896
38,687
kWh
- - - - -
03 2.1311: Replace electrically-operated equipment with fossil fuel equipment $1,819 $620 - $961
-
kW-mo/yr
$858
-
MMBtu
- - -
04 2.6212: Turn off equipment during breaks, reduce operating time $1,039 $195 $447
9,086
kWh
$592
-
kW-mo/yr
- - - -
05 2.4231: Reduce the pressure of compressed air to the minimum required $727 - $407
8,206
kWh
$320
-
kW-mo/yr
- - - -
06 3.5131: Recycle white water $180,189 $400,000 - - - $180,189
-
gal
- -
07 4.111: Add equipment/ operators to reduce production bottleneck $336,172 $311,000 - - - - - $336,172
08 4.423: Move product using mechanical means $19,800 $8,000 - - - - - $19,800
09 4.423: Move product using mechanical means $14,850 $1,200 - - - - - $14,850
10 3.1191: Change procedures / equipment / operating conditions $24,243 $3,300 - - - - $24,243
-
lb
-
TOTAL RECOMMENDED $591,743 $737,344 $9,547
194,607
kWh
$6,084
-
kW-mo/yr
$858
-
MMBtu
$180,189
-
gal
$24,243
-
lb
$370,822
TOTAL IMPLEMENTED $181,955 $400,195 $854
17,292
kWh
$912
-
kW-mo/yr
- $180,189
-
gal
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (non-haz) Savings Solid Waste (haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs