| Assessment Year | 1998 |
|---|---|
| Principal Product | Prefabricated Buildings |
| NAICS |
n/a
|
| SIC | 3448: Prefabricated Metal Buildings and Components |
| Sales Range | $10 M to 50M |
| # of Employees | 350 |
| Plant Area |
2,800
ft2
|
| Annual Production | 2,000
pieces
|
| Production Hrs. Annual | 4,208
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $69,359 | 906,800 |
kWh
|
$0.076 |
| Electricity Demand | $25,601 | 3,121 |
kW-mo/yr
|
$8.20 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $80,057 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $44,008 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Other Liquid (haz) Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $9,498 | $1,550 |
$7,285
94,666
kWh
|
$2,213
-
kW-mo/yr
|
- | - | |
| 02 | 2.7261: Install timers and/or thermostats | $1,473 | $600 |
$1,473
19,050
kWh
|
- | - | - | |
| 03 | 2.4221: Install compressor air intakes in coolest locations | $491 | $221 |
$491
6,448
kWh
|
- | - | - | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $17,631 | $13,030 |
$13,584
176,436
kWh
|
$4,047
-
kW-mo/yr
|
- | - | |
| 05 | 2.7144: Install spectral reflectors / delamp | $2,099 | $1,980 |
$1,443
18,757
kWh
|
$656
-
kW-mo/yr
|
- | - | |
| 06 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $2,880 | $5,000 | - | - | - | $2,880 | |
| 07 | 3.5311: Recover and reuse waste material | $11,900 | $60 | - | - |
$11,900
-
gal
|
- | |
| 08 | 4.112: Replace old machine with new automatic multi-station tool | $15,149 | $5,000 | - | - | - | $15,149 | |
| 09 | 4.122: Develop standard procedures to improve internal yields | $15,149 | - | - | - | - | $15,149 | |
| 10 | 4.421: Modify current incentive program | $3,787 | - | - | - | - | $3,787 | |
| TOTAL RECOMMENDED | $80,057 | $27,441 |
$24,276
315,357
kWh
|
$6,916
-
kW-mo/yr
|
$11,900
-
gal
|
$36,965 | ||
| TOTAL IMPLEMENTED | $44,008 | $21,620 |
$22,312
289,859
kWh
|
$6,916
-
kW-mo/yr
|
$11,900
-
gal
|
$2,880 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Other Liquid (haz) Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs