ITAC Assessment: GT0260
ITAC logo
ITAC Assessment: GT0260
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product FABRICATED SIGNS
NAICS
n/a
SIC 3993: Signs and Advertising Specialties
Sales Range $5
M
to 10
M
# of Employees 100
Plant Area
n/a
Annual Production 1,200
pieces
Production Hrs. Annual 2,080
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $54,711 676,143
kWh
Natural Gas $15,857 2,631
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,989 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,306

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $308 $217 $308
3,810
kWh
-
02 2.4133: Use most efficient type of electric motors $190 $323 $190
2,345
kWh
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,084 $500 $3,084
38,101
kWh
-
04 2.7243: Improve air circulation with destratification fans / other methods $375 $936 $(-47.0)
(-586)
kWh
$422
-
MMBtu
05 2.4322: Use or replace with energy efficient substitutes $4,032 $3,200 $4,032
49,824
kWh
-
TOTAL RECOMMENDED $7,989 $5,176 $7,567
93,494
kWh
$422
-
MMBtu
TOTAL IMPLEMENTED $7,306 $4,023 $7,306
90,270
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs