ITAC Assessment: SD0172
ITAC logo
ITAC Assessment: SD0172
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Aerospace safety equipment; mechanical flight control compon
NAICS
n/a
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 160
Plant Area 95,000
ft2
Annual Production 219,000
lb
Production Hrs. Annual 4,674
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $164,075 2,326,495
kWh
Electricity Demand $47,582 5,726
kW-mo/yr
Natural Gas $2,757 437
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $88,960 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $79,447

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 2.4133: Use most efficient type of electric motors $1,269 $940 $914
12,603
kWh
$355
-
kW-mo/yr
- - - -
02 2.7261: Install timers and/or thermostats $5,192 $4,200 $5,192
73,271
kWh
- - - - -
03 2.4226: Use / purchase optimum sized compressor $4,767 $5,600 $4,485
63,306
kWh
$282
-
kW-mo/yr
- - - -
04 2.1311: Replace electrically-operated equipment with fossil fuel equipment $3,093 $6,000 $1,295
18,171
kWh
$1,894
-
kW-mo/yr
$(-96.0)
-
MMBtu
- - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $4,239 $8,727 $3,260
46,014
kWh
$979
-
kW-mo/yr
- - - -
06 2.7144: Install spectral reflectors / delamp $8,038 $12,145 $5,590
78,839
kWh
$2,448
-
kW-mo/yr
- - - -
07 2.7135: Install occupancy sensors $2,285 $902 $1,545
21,688
kWh
$740
-
kW-mo/yr
- - - -
08 2.4314: Use synthetic lubricant $6,420 - - - - $6,420
-
gal
- -
09 3.5315: Lease / purchase baler; sell cardboard to recycler $4,420 - - - - - $4,420
-
lb
-
10 3.6193: Install equipment (eg compactor) to reduce disposal costs $3,341 $2,000 - - - - - $3,341
11 4.421: Modify current incentive program $4,675 $4,800 - - - - - $4,675
12 4.652: Replace existing equipment with more suitable substitutes $41,221 $200 - - - - - $41,221
TOTAL RECOMMENDED $88,960 $45,514 $22,281
313,892
kWh
$6,698
-
kW-mo/yr
$(-96.0)
-
MMBtu
$6,420
-
gal
$4,420
-
lb
$49,237
TOTAL IMPLEMENTED $79,447 $39,514 $20,986
295,721
kWh
$4,804
-
kW-mo/yr
- - $4,420
-
lb
$49,237
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs