Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Polyurethane Foam For Carpet Padding
NAICS
n/a
SIC 3086: Plastics Foam Products
Sales Range $50
M
to 100
M
# of Employees 400
Plant Area 10,650
ft2
Annual Production 92,513
thousand feet
Production Hrs. Annual 6,630
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $382,457 5,680,246
kWh
Electricity Demand $168,572 19,916
kW-mo/yr
Natural Gas $113,561 31,745
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $304,844 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $249,204

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (non-haz) Savings Personnel Changes Savings Administrative Changes Savings
01 2.4133: Use most efficient type of electric motors $18,513 $12,290 $14,896
222,450
kWh
$3,617
-
kW-mo/yr
- - - -
02 2.6231: Utilize controls to operate equipment only when needed $28,303 - - $28,303
-
kW-mo/yr
- - - -
03 2.5121: Redesign flow to minimize mass transfer length $27,336 $4,000 $27,336
463,365
kWh
- - - - -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $17,545 $38,000 $15,216
227,140
kWh
$2,329
-
kW-mo/yr
- - - -
05 2.4131: Size electric motors for peak operating efficiency $11,307 $1,800 $7,942
118,406
kWh
$3,365
-
kW-mo/yr
- - - -
06 2.4226: Use / purchase optimum sized compressor $9,941 $9,500 $7,208
107,562
kWh
$2,733
-
kW-mo/yr
- - - -
07 2.2442: Preheat combustion air with waste heat $3,325 $1,127 - - $3,325
-
MMBtu
- - -
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,455 $1,250 $1,154
17,292
kWh
$301
-
kW-mo/yr
- - - -
09 3.8131: Use water-based adhesives $55,640 - - - - $55,640
-
gal
- -
10 4.111: Add equipment/ operators to reduce production bottleneck $77,729 $211,365 - - - - $77,729 -
11 4.522: Modify storage space to avoid rental of a warehouse $53,750 $53,750 - - - - - $53,750
TOTAL RECOMMENDED $304,844 $333,082 $73,752
1,156,215
kWh
$40,648
-
kW-mo/yr
$3,325
-
MMBtu
$55,640
-
gal
$77,729 $53,750
TOTAL IMPLEMENTED $249,204 $333,082 $73,752
1,156,215
kWh
$40,648
-
kW-mo/yr
$3,325
-
MMBtu
- $77,729 $53,750
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (non-haz) Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs